Last Updated | 06/25/2020 12:39 PM |
Project Title | Sewer Extension to V.D. Parrott WTP Project |
Physical Address | View project details and contacts |
City, State (County) | Dalton, GA 30719 (Whitfield County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Storm/Sewers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Construct the Sewer Extension to V.D. Parrot WTP Project as shown in the drawings and specifications. The project will include the construction of a sanitary sewer force main as shown in the drawings. The force main to be constructed for this project will start at Dalton Utilities Riverwater Treatment Plant Lift Station and end at an existing manhole in the Coahulla Creek Estates subdivision as shown on the plans. This includes but not limited to installing a 6-inch HDPE force main, approximately 7,500 linear feet in length. The project will also consist of a Jack and Bore for the force main beneath the Lower Dawnville Road and beneath Coahulla Creek both with casing pipe and the installation of air release valves as shown in the drawings. Dalton Utilities will supply the HDPE pipe, casing pipe and gravel for the project. The contractor will be responsible for supplying all other materials. The Contractor’s work also includes all erosion, sedimentation, and pollution control necessary for the project. The cost of any permits required for erosion control and land disturbing will be borne by the Owner. The Contractor will be responsible for the cost of any other permits or licenses required to complete the work. The Contractor will complete all necessary clean-up and restoration work to include filling, finish grading, grassing, landscaping, pavement repairs, driveway repairs, culvert repairs, drainage ditch restoration and other necessary restoration activities such that post construction conditions are EQUAL TO OR BETTER than those conditions that existed prior to any construction activity occurring. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |