Similar Projects
Pump Track
New Construction
Conception
Groton, CT

Lower Broadway Complete Streets Improvement - City of Norwich
Infrastructure
Conception
$150,000 est. value
Norwich, CT

Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

On-Call Equipment and Labor Rates - Various Electrical Services
Alteration
Bidding
Preston, CT

Basketball Court
New Construction
Bidding
$40,000 est. value
Lebanon, CT 06249

Repairs to Medium Voltage ( 13.2Kv) Breaker Cabinet
Post-Bid
New London, CT 06320

Electrician Services
Term Contract
Post-Bid
Groton, CT

In-Line Hockey Rink Resurfacing
Results
Groton, CT

Athletic Field Construction at Grasso Technical High School
New Construction
Results
$9,181,087 to $9,831,727 est. value
Groton, CT 06340

ADA Entrance Improvements
Infrastructure
Bidding
$80,000 est. value
Waterford, CT 06385

Community Center Court Resurfacing
Renovation
Post-Bid
Groton, CT

New Sidewalk Construction
Results
Old Lyme, CT 06371

Fy21 R1 New England Electric Supply
Term Contract
Post-Bid

New London Generator Replacement
Results
$120,000 to $140,000 est. value
New London, CT 06320

Paving - Preston Plains Middle School Parking Lot
Infrastructure
Post-Bid
Preston, CT

Last Updated 06/23/2022 07:43 AM
Project Title

Armstrong Tennis LED Lights and Parking Lot/Lights - City of Norwich

Physical Address View project details and contacts
City, State (County) Norwich, CT   (New London County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Electric, Park/Playground, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected June 2023
Bids Due View project details and contacts
Estimated Value $195,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work, paving and outdoor lighting for a mixed-use development in Norwich, Connecticut. Conceptual plans call for site work for a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot. Transition halide lights to LED lights on the tennis courts. Also complete the parking lots and lighting at the facility. As of June 22, 2022, this project is in the early planning phase. An engineer has not been selected. Although a firm timeline for construction has not been determined, construction is not expected to start prior to May 2023.

Details

Park/Playground, Renovation.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 26 - Electrical.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents