Similar Projects
Pinecrest Academy Gymnasium
New Construction, Addition - 12,651 SF
Conception
Miami, FL 33185

Deerfield Beach HS SMART Program
Conception
$2,902,214 est. value
Deerfield Beach, FL 33441

Barbara W. Nelson Fine Arts Center
New Construction - 13,500 SF
Design
FL

Dorothy Thomas Classroom Addition - Liberty Middle School Court Cover - Vellemaire Transportation Site
Addition
Design
$5,023,000 est. value
Tampa, FL 33610

Coral Glades High School - Smart Program Renovations
Renovation
Bidding
$1,589,192 est. value
Coral Springs, FL 33065

Construction Management at Risk Firm for a New 6-8 Chaffee Trails Middle School
New Construction
Bidding
Jacksonville, FL 32221

New Construction of Water Spring Middle School
New Construction
Sub-Bidding
Winter Garden, FL 34778

George Washington Carver Middle School Renovations
Post-Bid
Less than $2,799,203 est. value
Coral Gables, FL 33133

Braden River Middle School - Renovation and Addition
Renovation, Addition - 1,431 SF
Post-Bid
Less than $26,000,000 est. value
Bradenton, FL 34202

Prototype Classroom Building Additions and Miscellaneous Maintenance Repair
Results
Less than $35,505,000 est. value
Largo, FL 33779

Package A - Deerfield Beach High School, Package B - Silver Lakes Middle School, Package C - Sheridan Technical High School
Results
$2,500,000 to $3,500,000 est. value
Deerfield Beach, Fort Lauderdale, North Lauderdale, FL

The Pine School
Addition - 22,369 SF
Construction
$6,800,000 est. value
Hobe Sound, FL 33455

Ridgeview Global Studies Academy
New Construction - 21,414 SF
Construction
$4,000,000 est. value
Davenport, FL 33837

Winter Park High School
Renovation
Conception
$9,900,000 est. value
Winter Park, FL 32792

Carrollwood Day School Center for Innovation
New Construction - 42,605 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Tampa, FL 33613

Last Updated 10/08/2021 01:51 PM
Project Title

Fort Myers Technical College (FMTC) Renovation

Physical Address View project details and contacts
City, State (County) Fort Myers, FL 33916   (Lee County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value $10,000,000 to $14,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Board is requesting qualifications for Construction Management Services. Awarded Construction Manager shall work with the School Board’s Facility Development & Programming Department and the selected Architecture Firm on the project described above. The Contractor shall be responsible for assisting during the preliminary design; the design development; and the construction document phase, including scheduling and coordination, and will be responsible for the successful, timely, and economical completion of the project.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents