Similar Projects
2021 Preventive and Critical Lining
Bidding
$3,600,000 to $4,000,000 est. value
Denver, CO 80202

Sand Traps - On-Call Single Trade Services
Post-Bid
Denver, CO 80202

Balboa Park Sewer Rehabilitation
Post-Bid
Denver, CO

35th Street and Lincoln Park Sanitary Improvements
Results
Less than $2,015,784 est. value
Denver, CO 80202

Force Main and Siphon Condition Assessment and Cleaning
Results
Denver, CO 80229

Construction of the East 69th Avenue Forcemain
Post-Bid
Denver, CO 80229

Interceptor Rehabilitation 2020 - 2022
Results
CO

Non-Destructive Excavating, Potholing, Hydro-Jetting and Vacuuming
Post-Bid
Denver, CO 80204

Sewage Ejectors Ellie Caulkins
Results
Denver, CO 80204

FNS Sanitation System
Term Contract
Post-Bid
CO

High Point Possum Gully Sanitary Sewer
Results
Denver, CO

East 64th Avenue and Denali Street Infrastructure Project
Post-Bid
Denver, CO 80202

East 16th Avenue System, Phase 1
Results
$8,500,000 to $9,400,000 est. value
Denver, CO 80202

Transmission System Structure Rehabilitation
Post-Bid
Denver, CO 80229

R3 S6 Sand Trap Cleaning
Results
Denver, CO 80204

Last Updated 12/31/2020 05:31 PM
Project Title

Tunnel Sewer Repairs

Physical Address View project details and contacts
City, State (County) Denver, CO   (Denver County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project entails the relocation of existing underground plumbing to above ground in the Utility Tunnel area from South of Concourse A to North of Concourse C at Denver International Airport (DEN). Work also includes adding floor drains and flexible connectors, fixing leaking pipes, and rerouting and lining existing underground pipe in the area under the East Baggage Tunnel. The driving need for this project is that many of the centrally located sewer lines at DEN are not draining due to soil heaving. This is causing backups in drains and standing water in the baggage tunnels which has been recognized as a safety concern. Currently, DEN Maintenance must frequently unclog these drainage lines

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents