Similar Projects
Last Updated | 05/20/2022 01:18 AM |
Project Title | Cherry Street Green Infrastructure |
Physical Address | View project details and contacts |
City, State (County) | Easthampton, MA (Hampshire County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $2,540,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Cherry Street Green Infrastructure Project. Roadway reconstruction, replace water and sewer, street drainage work, outfall repair and stream bank stabilization. roadway reconstruction including new curbing and sidewalks; green and traditional stormwater infrastructure improvements to enhance water quality, promote recharge, and increase flood resiliency; water and sewer main and lateral replacements; restoration of the deteriorating Cherry Street outfall; and the bioengineered stabilization of adjacent, eroded bank areas along Brickyard Brook. The project includes approximately 2,000 linear feet of roadway reconstruction; the replacement of approximately 1,900 linear feet of traditional stormwater infrastructure with new storm drain piping, drain manholes, and deep-sump, hooded catch basins; and the incorporation of approximately 1,400 square feet of bioretention planters and 7 tree box filters. Additionally, the project is providing approximately 2,000 linear feet of 8-inch water main; providing approximately 2,100 linear feet of 12 inch PVC sewer pipe in Cherry Street; and replacing hydrants, gate valves, and water/sewer services to the property lines for existing residents. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |