Similar Projects
Northwest Treatment Plant Upgrade
Addition
Conception
Rio Vista, CA

Water Treatment Plant Security Improvements - City of Brentwood
Renovation
Conception
$567,000 est. value
Brentwood, CA 94513

Pacheco Reservoir Enlargement - Santa Clara Valley Water District
Addition
Design
$2,525,000,000 est. value
Gilroy, CA

Pardee Recreation Area and Pardee Center Water Treatment Plant Improvements
Renovation
Bidding
$2,500,000 to $3,500,000 est. value
Valley Springs, CA 95252

Granular Activated Carbon Media Suppliers for PFAS Treatment and Wells Rehabilitation
Infrastructure
Bidding
Pleasanton, CA

Scum Drying Beds 2021
Renovation, Alteration
Post-Bid
Cutler, CA 93615

Development Of Calaveras County Water District Emergency Response Plan For Compliance With America Water Infrastructure Act Of 2018
New Construction
Post-Bid
CA

Laguna Treatment Plant Filter Valves and Actuators Replacement and Aeration Basins Improvements
Renovation
Results
Santa Rosa, CA 95401

MCWD Well 4 TCP and Nitrate Mitigation Project
Alteration
Results
$1,432,000 est. value
Bakersfield, CA 93313

Groundwater Treatment Plant Design-Build (Phase B)
New Construction, Infrastructure
Construction
Anaheim, CA

East Primary Rehabilitation, Seismic Retrofit and Odor Control - City of San Jose
Renovation
Conception
$93,952,000 est. value
San Jose, CA 95134

Contractor - Pre-qualifications from Interested General Contractors (GC-SOPQ) for Spec 2128
Renovation
Bidding
$128,000,000 to $164,000,000 est. value
Oakland, CA

San Jose State University Water Treatment
Term Contract
Post-Bid
San Jose, CA

Water Pollution Control Plant Oxidation Pond Levee Maintenance
Renovation, Term Contract
Results
Sunnyvale, CA

Oak Hill Tank Replacement - City Of Petaluma -
New Construction, Demolition, Infrastructure
Conception
$4,000,000 est. value
Petaluma, CA

Last Updated 07/22/2022 05:36 AM
Project Title

Fullerton Main Plant PFAS Water Treatment Plant Project

Physical Address View project details and contacts
City, State (County) Anaheim, CA 92801   (Orange County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $6,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing all labor, materials and equipment for: The Fullerton Main Plant PFAS Water Treatment Plant project generally consists of the following major components. 1. Take delivery and install District furnished Dual Media Pressure Vessel systems at the Water Treatment Plant including pressure testing, disinfection, and bacteria testing. 2. Take delivery and install District furnished Granular Activated Carbon (GAC) system media into dual media pressure vessels. 3. Furnish and install a backwash system for the Granular Activated Carbon (GAC) system. Coordinate and assist with installation of District purchased media. 4. Rehabilitation (redevelopment) of City water supply well number 3A. 5. Furnish and install a new well pump and motor. 6. Water Treatment Plant Structural Concrete: Construct structural concrete at the Fullerton Main Plant site for the PFAS Water Treatment Plant. 7. Connect to the Water Treatment Plant and to the distribution system: Furnish and install epoxy lined and coated above ground piping and epoxy lined and cement mortar coated (CMC) buried pipelines to the Granular Activated Carbon (GAC) system. Construct epoxy lined and coated above ground piping and epoxy lined and cement mortar coated (CMC) buried pipeline from the GAC system to the connection to the distribution system. 8. Paving and Site Improvements: Grading, Asphalt Paving, and drainage at the new water treatment plant. 9. Exterior Wall, gate, landscaping, and irrigation. 10. Electrical and Instrumentation: Electrical equipment and facilities, and instrumentation equipment and facilities at the new water treatment plant. Instrumentation and control systems shall be coordinated with the City's Controls Integrator. 11. Provide all commissioning and start-up-services.

Details

Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents