Similar Projects
Mt Bighorn Warman Loop Road
Term Contract
Design
MT

Gaoa Big Hole Recreation Site Renovations, Montana
Term Contract
Design
$500,000 to $1,000,000 est. value
Butte, MT 59707

Main Street - Winnett
Infrastructure
Bidding
$6,000,000 est. value
Winnett, MT 59087

Routing and Crack Sealing Colstrip North Miles City Area
Infrastructure
Bidding
$300,000 est. value
Miles City, MT

Pistol Range, Parking & Road Improvements
Alteration
Post-Bid
Billings, MT

Grading, Gravel, PMS Surfacing, Drainage, Rumble Strips, Fencing and Pavement Markings on the SF 169 Fairfield Curve Improvements
Infrastructure
Post-Bid
MT

2021 Water System Improvements
Infrastructure, Alteration
Results
$4,051,000 est. value
Bigfork, MT 59911

Plant Mix Surfacing
Infrastructure
Results
MT

Jackson Creek Road Improvements
Term Contract
Design

Fort Peck Housing Authority 2022 Developments
Infrastructure
Bidding
$300,000 est. value
Poplar, MT

Chip Seal E Frontage Road SE Of Dutton Airport Great Falls Area
Infrastructure
Post-Bid
Belgrade, MT 59714

Asrwss Fort Peck West Branchlines Project; Phase 2, Phase 3 And Phase 4
Alteration
Results
Poplar, MT 59255

D/ B - Emergency Relief (ER) - Red Lodge Area Flood Repairs
Infrastructure
Design
$300,000 est. value
Red Lodge, MT 59068

Chip Seal Melrose to Divide Frontage Road Butte Area
Infrastructure
Bidding
$300,000 est. value
Butte, MT

Removal and Replacement of Road and Parking AC Pavement in Riverfront Park
Infrastructure
Post-Bid
Billings, MT

Reported 07/12/2022 12:00 AM
Project Title

Routing and Crack Sealing Lincoln Avenue South and Lambert East Miles City

Physical Address View project details and contacts
City, State (County) Miles City, MT   (Custer County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project Site #1: Lincoln Avenue South Route: Mt-16 Milepost: 50.0 - 51.8. Provide all labor, materials, equipment, traffic control and incidentals necessary to crack seal 1.8 miles of road on route mt-16. Average roadway width is 80 feet. Cracks shall be routed and sealed per the special provisions. Project Site #2: Lambert East Route: Mt-200 Milepost: 49.26 - 71.13. Provide all labor, materials, equipment, traffic control and incidentals necessary to crack seal 21.87 miles of road on route MT-200. Average roadway width is 28 feet. Cracks shall be routed and sealed per the special provisions.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents