Similar Projects
Greenlawn Water District - Annual Maintenance Contracts - Contract W
Term Contract, Infrastructure
Bidding
Greenlawn, NY

Annual Maintenance Contracts - Contract W - District-Wide Well and Well Pump Maintenance and Repair
Term Contract
Bidding
Greenlawn, NY

Remove, Supply and Install Three Inverters/Heat Pumps
Term Contract
Post-Bid
Babylon, NY 11702

Drilling of Wells and Test Borings
Term Contract
Post-Bid
Great River, NY

Construction Of a 20" x 10"- Diameter Well (No. 6)
Infrastructure
Results
Bellport, NY 11713

Drilling of Wells and Test Borings
Term Contract, Infrastructure
Results
NY

Contractor Services
Term Contract, Infrastructure
Post-Bid
Greenport, NY

Wellhead Treatment for 1,4-Dioxane at Plant No. 3
Alteration
Results
Huntington Station, NY 11746

Zone A Wells Reconditioning and/or Redevelopment
Term Contract
Post-Bid
Great River, NY

Submersible Leachate Pump, Breakout Box and Master Control Panel
Alteration
Results
Lindenhurst, NY

Requirements Contract for Glass & Glass Installation - Purchase of Gunnco or Equal Pumps
Alteration
Post-Bid
Lindenhurst, NY

Wellhead Treatment for Removal of Perfluorinated Compounds at Plant No 5
New Construction, Infrastructure
Results
Riverhead, NY 11901

Centrifugal Pump
Term Contract
Post-Bid
Yaphank, NY

20" X 10"- Diameter Well (No. 3A)
Term Contract
Results
Brentwood, NY 11717

Purchase Of One Or More Gunnco Or Equal Pumps
Term Contract
Post-Bid
Babylon, NY

Last Updated 04/13/2022 09:20 AM
Project Title

Well Pump 19-1 Rehabilitation

Physical Address View project details and contacts
City, State (County) Huntington, NY   (Suffolk County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents