Similar Projects
High-Tech Logistics Park / Mobile
New Construction, Infrastructure
Conception
$19,000,000 CJ est. value
Mobile, AL 36602

Canfor Southern Pines Sawmill Complex / Mobile County
New Construction, Infrastructure
Design
$210,000,000 CJ est. value
Axis, AL 36505

Semmes Community Center Park - Shade Structures
Infrastructure
Bidding
$90,000 CJ est. value
Semmes, AL 36575

Perch Creek Area Sanitary Sewer Trunk Line CIPP
Infrastructure
Bidding
$5,400,000 CJ est. value
Mobile, AL 36602

Whistler Street Sidewalk Improvements
Post-Bid
$158,650 to $193,895 est. value
Prichard, AL 36610

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Craft Highway 20" Water Main
Results
Mobile, Prichard, AL

Copeland-Cox Tennis Center - ADA Improvements
Results
$502,900 est. value
Mobile, AL 36608

Murphy Oil #6987/7817 / Semmes
Demolition, New Construction, Infrastructure - 1,400 SF
Construction
$2,000,000 CJ est. value
Semmes, AL 36575

Bob Williams Subdivision
Infrastructure
Pending Verification
Mobile, AL

Austal USA Auxiliary Floating Dry Dock / Mobile
Infrastructure
Pending Verification
$128,100,000 CJ est. value
Mobile, AL 36602

B051A01 System Rehab Phase II
Infrastructure
Bidding
$2,000,000 CJ est. value
Mobile, AL 36602

Semmes Municipal Complex
New Construction
Post-Bid
Semmes, AL

Ann Street Rehabilitation
Results
$2,820,874 est. value
Mobile, AL 36628

Barry 8 Power Plant Natural Gas Unit
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Bucks, AL 36512

Last Updated 09/23/2022 10:10 AM
Project Title

2018 PAYGO- North McGregor Avenue Reconstruction

Physical Address View project details and contacts
City, State (County) Mobile, AL 36608   (Mobile County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of September 23, 2022, project was awarded to John G. Walton Construction but awarded amount is not available.** Sidewalks, Asphalt, Curbing, Drainage, Utilities Each bid shall be accompanied by a check or bid bond for the sum of five percent (5%) of the amount bid (maximum amount of bond $10,000), made payable to the CITY, and certified by a reputable banking institution. These monies shall serve as assurance that within ten (10) days of notice of contract award contemplated in the Proposal, the successful bidder will enter into such contract and file a bond for the execution of same. The performance bond required will be for the amount bid, and labor and material bond shall be one hundred percent (100%) of the amount of contract, and shall be made by a Surety Company acceptable to the City of Mobile and upon the forms of bonds appended hereto. In default of the entering into of such contract and the execution of such bond, the certified check required to accompany such bid shall be forfeited to the City of Mobile, Alabama. These fees shall not be a penalty but damages for delays, or for the additional cost or expenses that the CITY may incur by reason of such default. Liquidated damages for non-completion of the work within the time limit agreed upon will be assessed according to Section 108.11 of Alabama Department of Transportation Standard Specifications for Highway Construction 2018 Edition. The awarding of a contract will require the Contractor to pay the prevailing wage rates for this district that are applicable to the trades engaged in this project. No questions, whether orally or written, will be addressed after 12:00 p.m. on Monday, August 15, 2022. The City of Mobile reserves the right to reject any and all bids and waive informalities in the bidding.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents