Similar Projects
Chester Creek Trail Phase 2
Design
$416,907 est. value
Media, PA 19063

Bituminous Seal Coat
Post-Bid
PA

Brandt School Road Betterment Marshall Township And Franklin Park Borough
Post-Bid
Harrisburg, PA

PA 104 to Market ST
Results
$500,000 to $999,999 est. value
PA

Mike Wood Boulevard - PA ST Keystone
Results
$1,000,000 to $5,000,000 est. value
PA

Scranton Ward, Scranton PA Stake Parking Lot Renovations
Renovation
Construction
$25,000 est. value
Clarks Summit, PA 18411

The Church Of Jesus Christ Of Latter-Day Saints, Parking Lot
Construction
$250,000 est. value
Berwick, PA 18603

Fall Brook Road T-612 Project
Post-Bid
Starlight, PA 18461

2019 Blairsville Highway Turn Back Project Old Main Street and South Liberty Street
Results
Blairsville, PA

Installation of the White Birch Road Extension at Humboldt Industrial Park
Construction
Hazleton, PA 18202

Bituminous Resurfacing Between Milepost 333.99 and Milepost 340.05 and Median Barrier Replacement Between Milepost 337.37 and Milepost 340.03
Post-Bid
PA

Horace Mann Street improvements
Results
Less than $775,000 est. value
PA

Whitebirch Road Extension
New Construction
Construction
Hazle Township, PA 18201

Yearly Contract for Flat Saw Cutting of Paved Surfaces
Term Contract
Post-Bid
New Stanton, PA 15672

Gettysburg Road Drainage and Widening Project Phase II
Results
Littlestown, PA

Last Updated 11/03/2020 02:33 PM
Project Title

Rehabilitate Park Roads and Bridges, Clear Creek State Park

Physical Address View project details and contacts
City, State (County) Sigel, PA 15860   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work included under this contract consists of full depth reclamation (16,700 SY), pavement overlay and full depth paving of existing paved roadways and parking lots within the Park. Drainage improvements are also included as part of the project including culvert pipes (740 LF), inlets and endwalls.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents