Project Status | Results, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $151,330 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This renovation project is for the McCreary Center - Roof Replacement located at 141 College St., Whitley City, Kentucky 42653. The architectural scope of work for this project includes the following: -Remove existing shingle roof, repair and replace damaged substrate (where / if applicable). Install new asphalt dimensional shingles on the main building and the adjacent pavilion. Approximately 24,348 sq. ft. shingle roof area -Remove low slope area of asphalt shingle and install new standing seam metal roof as indicated on plans. Approximately 621 sq. ft. standing metal seam roof area -Install new ridge vents and shingle intake vents as indicated on the drawings. -Add-alternate: remove existing shingle roof on pavilion and install new asphalt dimensional shingle roof. Install new fascia and 2x6 perimeter framing. Approximately 1,670 sq. ft. of Pavilion roof area. 60 working days are provided from the execution of the construction contract to substantial completion. 15 working days are provided from substantial completion to final completion. The contractor will be responsible for coordinating areas of construction and the "shut down" of those areas per the project schedule as described in the Bid Documents. The contractor will be required to communicate and work closely with the McCreary Center Manager of Operations for project logistics, including shut downs, construction sequencing, and general construction activities Questions must be submitted no later than 12:00 PM, Eastern Time, June 7, 2023 |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |