Similar Projects
Roye-Williams Elementary School HVAC Systemic / Plumbing Renovation
Results
$8,900,000 est. value
Havre de Grace, MD 21078

Acquisition Systems HVAC Maintenance
Post-Bid
Aberdeen Proving Ground, MD

Upgrade and Installation of Environmental Chamber Controller
Results
Aberdeen Proving Ground, MD 21005

HVAC and Mechanical Preventative Maintenance and Repair Havre De Grace Readiness Center
Term Contract
Results
Less than $50,000 est. value
Havre de Grace, MD 21078

Magnetic Bearing Chiller Preventative Maintenance and On-Call Services
Results
Bel Air, MD 21014

HVAC Service Contract
Post-Bid
Havre de Grace, MD 21078

HVAC and Mechanical Equipment Preventative Maintenance and Repair Laurel Readiness Center and FMS
Term Contract
Results
Less than $50,000 est. value
Laurel, MD 20708

On-Call HVAC Services
Results
$41,500 est. value
Bel Air, MD 21014

George D. Lisby Elementary School HVAC Renovation
Results
$5,000,000 to $10,000,000 est. value
Aberdeen, MD 21001

One (1) Dust Collector System
Results
Aberdeen Proving Ground, MD 21005

Full Service Maintenance and Support for APC In-Row Cooling Units
Results
Gunpowder, MD

Chiller Maintenance and On-Call Services
Results
Bel Air, MD 21014

HVAC Addition Maintenance Facility
Results
Less than $100,000 est. value
Aberdeen, MD 21001

AAWWTP Heat Exchanger Replacement
Results
Aberdeen, MD 21001

Abingdon Library RTU Replacements
Results
Abingdon, MD

Last Updated 11/19/2020 03:36 PM
Project Title

HVAC Upgrades - Harford County Administration Building

Physical Address View project details and contacts
City, State (County) Bel Air, MD 21014   (Harford County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes replacing the primary AHU’s for the basement, second and third floors of the Harford County Government Administrative Offices at 220 South Main Street, Bel Air MD. The existing AHU’s include water source AC units with electric heat. The replacement AHU’s will be water source heat pumps with electric heat.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents