Similar Projects
Z2DA--Replace Boilers and Controls, Phase II (VA-20-00028010)
Renovation
Design
$5,000,000 to $10,000,000 est. value
Grand Junction, CO 81501

Synopsis- Environmental Remediation Services & Construction for Rocky Mountain Arsenal
New Construction
Design
Commerce City, CO

Fountain PFC Treatment Facility Superstructure
New Construction
Bidding
Fountain, CO

Water Chemical and Services
Post-Bid
CO

Water Treatment Plant Expansion Project
Post-Bid
Orchard, CO

Construction Manager for Wastewater Building Improvements
Results
Denver, CO

Water Treatment Facility Improvements Project
Results
Elizabeth, CO

Wtp Treatment Chemical
Post-Bid
Louisville, CO 80027

Fy2019 Wastewater Reclamation Facility West Overlay Project
Results
$250,000 to $300,000 est. value
Pueblo, CO 81003

Leadville Mine Drainage Tunnel Water Treatment
Post-Bid
$10,000,000 est. value
Leadville, CO

2019 Water Treatment Plant Office Addition
Addition
Results
Pueblo West, CO 81007

Chatfield Basin Water Reclamation Facility
Post-Bid
Greenwood Village, CO 80112

WWTP Blower Improvements
Results
Less than $300,000 est. value
Estes Park, CO 80511

Water Treatment Plant Maintenance Work
Post-Bid
Brighton, CO 80016

Wemlinger Wpf Filter Rehabilitation (#1 and #6)
Results
CO

Last Updated 03/16/2021 01:53 PM
Project Title

Chemical Water Treatment Services

Physical Address View project details and contacts
City, State (County) CO   (Jefferson County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Seeking a qualified contractor (“Contractor”) to provide on-going water treatment services for the Mines Chiller Plants and Closed Loops Water Treatment Systems. Contractors must be able to provide the following treatment services for six (6) Chiller Plants and 77 closed loop systems across the Mines campus.

Details

Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 11 - Equipment, Laboratory Equipment.
Division 13 - Special Construction.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents