Similar Projects
Rehabilitate the Madison Junction Water Treatment and Spring Collection System
Infrastructure
Bidding
$1,000,000 to $5,000,000 est. value
Yellowstone National Park, WY 82190

Cheyenne / US 85
Infrastructure
Bidding
$200,000 est. value
Cheyenne, WY 82008

Greys River Waterline Replacement
Infrastructure
Post-Bid
$400,000 est. value
Alpine, WY 83128

Afton Elementary Fire Loop Waterline 2021
Alteration
Post-Bid
Afton, WY 83110

The Construction of 2021 Fall Street Patching Project
Infrastructure
Results
Jackson, WY 83002

Leavitt Reservoir Expansion Project
New Construction, Infrastructure
Results
$40,000,000 to $50,000,000 est. value
Greybull, WY

Sheridan - Buffalo (Various Locations / Slide)
Infrastructure
Bidding
$200,000 est. value
Sheridan, WY

Cottonwood Emergency Waterline Replacement
Infrastructure
Post-Bid
Edgerton, WY 82635

Bar Nunn Asphalt Improvements - Phase II
Alteration
Results
$293,832 est. value
Bar Nunn, WY

Green River Streets Uinta and 2nd / Riverview / Monroe
Infrastructure
Bidding
$200,000 est. value
Green River, WY

2021 Water Sewer Rehabilitation Project
Infrastructure
Post-Bid
Albin, WY

Casper - Kaycee (Horse Ranch Creek South)
Infrastructure
Results
Casper, Kaycee, WY

Casper - Kaycee (Midwest Section)
Infrastructure
Bidding
$200,000 est. value
Casper, WY 82605

WY NPS Yell 10(23), Grand Loop Road - Old Faithful To West Thumb
Term Contract
Post-Bid
Yellowstone National Park, WY

District 3 Bridge Rehabilitation
Infrastructure
Results
WY

Last Updated 06/23/2022 08:08 AM
Project Title

Kluver Road PRV Project

Physical Address View project details and contacts
City, State (County) Gillette, WY 82716   (Campbell County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Project Will Remove An Existing Prv Vault And Install a New 10' x 18' Cmu Building With One 2" And One 8" Prv Located Inside Of It. a 16' x 28' Concrete Pad Will Be Placed Outside Of The Building, Along With a Chainlink Fence. Electrical Service Will Be Brought To The Building And Terminated At a Disconnect. New Conduit Will Be Installed For Fiber To The Building.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents