Similar Projects
Central School Road and St. Peters- Howell Road Traffic Flow Improvements
Infrastructure
Bidding
Saint Peters, MO 63376

Swale and Culvert Work
Alteration
Post-Bid
Saint Peters, MO 63376

Plastic Pipe Liner, HDPE Pipe, and Polypropylene
Infrastructure
Post-Bid
Saint Charles, MO

Sidewalk and Drainage Improvements
Infrastructure
Results
Saint Charles, MO

Laura Drive Drainage Improvements
Infrastructure
Results
$320,000 est. value
O Fallon, MO

North Cool Springs Precast Box
Infrastructure
Post-Bid
O'Fallon, MO 63366

2021 Bank Stabilization & Navigation Project (Bsnp) Structures Repair
Term Contract
Results

Maintenance Culvert Replacement
Infrastructure
Post-Bid
Weldon Spring, MO 63304

Crystal Springs Creek Bank Stabilization Project
Infrastructure
Results
Saint Charles, MO

370 Lakeside Park 2nd Entrance Embankment
New Construction
Results
Less than $75,000 est. value
Saint Peters, MO 63376

36 Sanitite Hp Triple Wall Pipe
Infrastructure
Results
O Fallon, MO

Willott Road Culvert at West Branch of Spencer Creek
Infrastructure
Results
Saint Peters, MO 63376

Geotextile Material
Infrastructure
Results
Ballwin, Beaufort, Bella Villa, Cedar Hill, Country Club Hills, Creve Coeur, Crystal Lake Park, Eureka, Festus, Normandy, Pacific, Saint Charles, Saint Clair, Saint Louis, Sappington, Wentzville, MO 63141

Corrugated Metal Pipe
Infrastructure
Results
Josephville, Saint Charles, Saint Peters, Wentzville, MO 63385

Zumbehl Road Culvert Replacement Over Cole Creek
Infrastructure
Results
Saint Charles, MO 63303

Last Updated 04/15/2022 05:08 AM
Project Title

Duchesne and Hawthorn Culvert Replacement

Physical Address View project details and contacts
City, State (County) Saint Charles, MO   (Saint Charles County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project work shall include the following description of the work: Removal of existing box culvert and gabion walls at Duchesne and existing CMP at Hawthorn. Removal of pavements, curb and gutter, guardrail, fencing, water line, sewer pipe, trees, etc. Construction of a double cell 14’Wx12’H concrete box culvert and retaining walls at Duchesne and a double cell 14’Wx11’H concrete box culvert at Hawthorn, as well as water line, sanitary sewer, storm sewer, pavement, curb and gutter, sidewalk, fencing, and all incidental items necessary to complete the work shown on the project plans.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents