Similar Projects
Distribution Center
Demolition - 182,000 SF
Conception
Mebane, NC 27302

The Maintenance Team Building
New Construction - 100,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Charlotte, NC 28217

MANNA Foodbank
New Construction, Addition - 100,000 SF
Design
$3,000,000 est. value
Asheville, NC 28805

Saltwater Properties, LLC
New Construction - 4,800 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Wilmington, NC 28401

Army Reserve Center
New Construction - 42,918 SF
Bidding
$25,000,000 est. value
Asheville, NC

Albemarle Warehouse Breakroom Renovation
Renovation
Bidding
$710,000 est. value
Rocky Mount, NC 27801

AAA Self Storage
New Construction - 65,445 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Durham, NC 27703

Climate Controlled Storage Facility
New Construction - 93,045 SF
Post-Bid
Waxhaw, NC 28173

New Maintenance Garage for Eastern NC School for The Deaf
New Construction - 1,990 SF
Results
Wilson, NC 27893

DPS-ABC Commission Warehouse Rack Addition
Renovation
Results
$150,000 to $350,000 est. value
Raleigh, NC 27610

Carmel Road Post Office Site
New Construction
Construction
$7,500,000 est. value
Charlotte, NC 28226

Printworks Mill
Renovation - 421,845 SF
Construction
$54,000,000 est. value
Greensboro, NC

Coastal Carrier
New Construction - 50,000 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Castle Hayne, NC 28429

Storage Facility Addition
New Construction, Addition
Pending Verification
Benson, NC 27504

Freedom Lawns Office
New Construction, Renovation - 1,530 SF
Conception
Wilmington, NC

Last Updated 05/18/2022 11:08 AM
Project Title

P1394 Phase B Boat and Vehicle

Physical Address View project details and contacts
City, State (County) Cherry Point, NC   (Craven County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Pre-Solicitation
Bids Due View project details and contacts
Estimated Value $10,000,000 to $25,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project constructs a Boat Maintenance and Storage Facility and a Large Vehicle Maintenance Storage Building. The Boat Maintenance and Storage Facility will consist of a single-story, 18,000 total gross square foot, boat and engine repair and storage building. The building will consist of a pre-engineered metal building (PEMB) with reinforced CMU infill exterior walls. The building will include spaces for rubber repair, engine repair, parts storage, life safety storage, boat storage, SIPR Net Café, men’s and women’s restroom facilities with locker rooms and showers, and spaces as needed for all necessary mechanical, electrical, telecom, and data equipment systems. The Large Vehicle Maintenance Storage Building will consist of a single-story, 20,000 total gross square foot bulk storage facility. The building will consist of a pre-engineered metal building (PEMB) with reinforced CMU infill exterior walls. The building is organized around five single bay, caged storage areas and one multi-bay, caged storage area, each of which is served by a dedicated shipping/ receiving office. Within these storage areas, 12’x12’ and 12’x20’ interior caged storage spaces will be provided in accordance with the building program, and space for all necessary restroom, mechanical, electrical, and telecom systems are provided within the building enclosure. A separate, covered canopy structure is provided for weather protection charging of (3) fork lift vehicles, required for the operation of this facility. Built-in equipment includes vehicle lifts, compressors, and casework. Special construction features include soil surcharge loads, wetlands mitigation, and storm water best management practices. Electrical systems include primary power distribution, lighting, energy monitoring/control systems, intrusion detection system, telephone/data switch/server rooms, electrical switch gear, transformers, circuits, and fire alarms. Mechanical systems include plumbing, fire protection, compressed air, dehumidification, air conditioning systems, and digital controls. Information systems include telephone, data, local area network, mass notification and intercom. Site work will include building utility systems, traffic control, parking, domestic water, fire protection water, sanitary sewer, sewage conveyance, propane gas networks, perimeter security fencing, gates, storm water management, fiber/copper communications, cable television, and area lighting.

Details

Warehouse/Storage, 1 Story Above Grade, Approximately 18,000 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents