Similar Projects
Reconstruction of IL 78
Infrastructure
Bidding
$500,000 CJ est. value
Morrison, IL 61270

Reconstruction of IL 78
Infrastructure
Bidding
$500,000 CJ est. value
Morrison, IL 61270

Addition and Renovation to Erie CUSD Annex Building Bid Package 2
Addition, Demolition, Renovation, Infrastructure
Sub-Bidding
$13,875,846 CJ est. value
Erie, IL 61250

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Rock Falls - Routing and Crack Filling
Infrastructure
Results
Rock Falls, IL

Rock Falls - Sidewalk and Curb & Gutter
Infrastructure
Results
Rock Falls, IL

Exceptional Care and Training Center
New Construction, Infrastructure - 49,600 SF
Pending Verification
$27,100,000 CJ est. value
Sterling, IL 61081

New Toilet Room Building at Sterling High School
New Construction, Infrastructure
Bidding
$640,000 CJ est. value
Sterling, IL 61081

2022 Sidewalk/Curb Maintenance Program
Term Contract, Infrastructure, Alteration
Post-Bid
Sterling, IL

3rd Avenue Reconstruction
Infrastructure
Results
$1,396,391 est. value
Rock Falls, IL 61071

Mowing
Term Contract, Alteration
Post-Bid
Fulton, IL

Oppold Marina Site Improvements
Infrastructure
Results
Sterling, IL 61081

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Deck Patching with Scarification and Polymer Concrete Wearing Surface on SN 098-0051 Carrying Avenue "G" Over The North Branch of the Rock River in Sterling
Infrastructure
Results
IL

Last Updated 07/24/2023 11:07 AM
Project Title

Mill and Overlay With Areas of Base Repair, Sidewalk Ramp Replacement

Physical Address View project details and contacts
City, State (County) Morrison, IL 61270   (Whiteside County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $4,500,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

City/County: Morrison Section No. 22-00038-00-RS Mill and Overlay With Areas of Base Repair, Sidewalk Ramp Replacement, Storm Structure Replacement, Curb and Gutter Replacement and Other Related Appurtenances. Hma Surf Cse, Il9.5 C N50 (1,073 Ton); Pcc Sidewalk 4" (3,381 Sf); Hma Surf Rem 2" (9,307 Sqyd); Comb C&g Rem (474 Ft); Manholes Tba (10 Each); Comb C&g (432 Ft); Class B Patch in (281 Sq Yd); Class D Patch in (379 Sqyd) ILDOT - Mill and Overlay With Areas of Base Repair, Sidewalk Ramp Replacement Street improvements project including milling, HMA overlay, concrete sidewalk ramps, concrete curb and gutter and other related appurtenances. Roads to be improved include N. Jackson St., N. Cherry St., and N. Heaton St. in Morrison, IL.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents