Similar Projects
Aggregate Materials
Term Contract
Sub-Bidding
Wheaton, IL 60187

Window Cleaning Services
Alteration
Post-Bid
Glen Ellyn, IL 60137

Supply and Servicing of Portable Restrooms
Alteration
Post-Bid
Wheaton, IL

Aerial Spraying of Aquatic Glyphosate Herbicide
Term Contract
Results

Emergency/ Maintenance Electrical, Plumbing, HVAC, Pest Control and Generator Services for Municipal Buildings
Term Contract, Alteration
Results
Wood Dale, IL

QBS DOIT Professional Fiber Engineering Services
Renovation, Infrastructure
Post-Bid

Classroom Locksets
Term Contract
Results
$199,600 CJ est. value
Naperville, IL 60540

Fuel Site and Storage Tank Inspections and Repairs
Term Contract
Post-Bid
Naperville, IL

Snow and Ice Removal Services for City Sidewalks
Term Contract
Results
$6,450 CJ est. value
Wheaton, IL 60187

Large Diameter Water Meter Testing and Repair/Replacement Services
Term Contract
Post-Bid
Naperville, IL

Snow and Ice Removal Services for Parking Lots and Garages
Term Contract
Results
Wheaton, IL 60187

Mosquito Abatement Services
Alteration
Post-Bid
Downers Grove, IL

Rental/Service of Portable Toilets for Various City Divisions
Alteration
Post-Bid
Aurora, IL

Job Order Contracting
Term Contract
Post-Bid

Water System Leak Detection Services
Term Contract
Post-Bid
Woodridge, IL 60517

Last Updated 11/15/2022 12:08 PM
Project Title

FY23 Television Inspection of Sanitary and Storm Sewers

Physical Address View project details and contacts
City, State (County) Bloomingdale, IL 60108   (DuPage County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

DESCRIPTION OF WORK The proposed improvement consists of the cleaning and closed-circuit television inspection of approximately 53,055 feet of various size sanitary main and 26,970 feet of various size storm sewers located in the Village of Bloomingdale, Illinois. PREVAILING WAGE The successful Contractor shall comply with the Illinois Prevailing Wage Act requirements (820 ILCS 130/1-12) for this contract including submission of certified payroll requirements and the employment of Illinois workers during periods of excessive unemployment. BID SECURITY All Proposals must be accompanied by a Bank Cashier's Check, Bank Draft, Certified Check or Bidder's Bond, made payable to the Treasurer of the Village of Bloomingdale, for not less than five (5) percent of the total bid. REJECTION OF BIDS The President and Board of Trustees reserve the right to reject any and all proposals and to waive any and all technicalities.

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents