Similar Projects
Redwood Living - Portage - Rental Home Community
New Construction
Conception
Portage, MI 49002

Harbor 31 - Dry Dock
New Construction
Conception
Muskegon, MI 49440

Storage of America
Renovation - 53,650 SF
Design
Taylor, MI 48180

Bearing Service Warehouse
New Construction, Addition - 5,227 SF
Design
$400,000 est. value
Warren, MI 48091

2022 Neil Reid Park Comfort Station Addition
Addition
Bidding
Clinton Township, MI 48036

Two (2) Pole Barns
New Construction
Bidding
$2,000,000 est. value
Flint, MI 48505

Public Storage - Climate Controlled Warehouse
New Construction - 33,274 SF
Post-Bid
Waterford, MI 48328

Public Storage
New Construction
Post-Bid
Trenton, MI 48183

New JROTC Fieldhouse - Phase 1
Results
Flint, MI

Cold Storage Building
New Construction - 4,000 SF
Results
Sandusky, MI

Pinnacle Race Course
New Construction
Construction
$10,000,000 CJ est. value
Huron Township, MI

Neighborhood Storage
New Construction - 32,100 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Midland, MI 48640

Warehouse Facility
New Construction
Pending Verification
$10,000,000 CJ est. value
Kalamazoo, MI

Covenant Christian High School - Athletic Field Improvements
New Construction, Renovation - 960 SF
Pending Verification
Less than $500,000 CJ est. value
Grand Rapids, MI 49534

The Space Shop Self-Storage Facility
Renovation, Addition - 1,049 SF
Conception
Livonia, MI 48150

Last Updated 05/19/2022 01:09 AM
Project Title

Bridgeport Forensic Lab -Polebarn Addition

Physical Address View project details and contacts
City, State (County) Bridgeport, MI 48722   (Saginaw County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A 12' addition onto the existing west end of the pole barn. Work of all trades as specified in the Contract Documents must be completed in 120 calendar days from the date of Notice-to-Proceed

Details

Warehouse/Storage, Addition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents