Similar Projects
Tohono O'odham Nation - Integrated Fixed Tower (Ton Ift) Project Road And Site Preparation
Design
$10,000,000 to $25,000,000 est. value
Tucson, AZ 85746

Route N16-Inscription House
Post-Bid
Window Rock, AZ

Construct N12(19-4)1,2 and 4 Road Improvement Project
Post-Bid
Tsaile, AZ

Median Islands - University Drive from College Avenue to Veterans Way
Results
Tempe, AZ

VA Tucson Resurface Roads
Results
$1,000,000 to $2,000,000 est. value
Tucson, AZ

Attesa Motorsports Complex Phase 1
New Construction
Construction
Casa Grande, AZ

Valencia East Extension
New Construction
Construction
$16,000,000 est. value
Tucson, AZ 85747

Y--Haekel Road Chipseal
Post-Bid
Safford, AZ

Design and construct general purpose lane
Results
AZ

Asphalt Cold Patching Materials; Upm, Aquapatch and Aquaphalt Bulk and Bagged
Post-Bid

System Enhancement (Other Enhancements)
Results
Less than $2,580,000 est. value
Apache Junction, AZ 85119

Annual Contract for Supplying Various Roadway Materials
Term Contract
Post-Bid
Holbrook, AZ

System Preservation (Engineering)
Results
Less than $31,500,000 est. value
AZ

Kayenta Shopping Center
Term Contract
Post-Bid
Kayenta, AZ 86033

Capacity Additions (Reconstruction)
Results
Less than $4,800,000 est. value
Maricopa, AZ 85138

Last Updated 04/15/2019 06:17 AM
Project Title

Pavement Rehabilitation and Upgrade Sidewalks

Physical Address View project details and contacts
City, State (County) Globe, AZ   (Gila County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $442,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The proposed project is located in Gila County on Oak Street from Ash Street (Highway US 60) to Hill Street and on Hill Street between Oak Street to Ash Street (Highway US 60), within the City of Globe. The work consists of pavement rehabilitation and upgrading the existing sidewalks and access ramps to meet current ADA accessibility guidelines. The work includes milling and repaving of asphaltic concrete pavement, constructing concrete curb, sidewalk, driveways, access ramps and catch basins, installing pavement markings, and other related work.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 14 - Conveying Equipment, Sidewalk Lifts.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents