Similar Projects
North Broadway improvements- Gladstone to NE Barry Road - City of Kansas City
Infrastructure
Conception
$394,000 CJ est. value
Kansas City, MO 64155

North Broadway improvements- Gladstone to NE Barry Road - City of Kansas City
Infrastructure
Conception
$394,000 CJ est. value
Kansas City, MO 64155

KC Tech Academy School Building / Liberty
New Construction, Infrastructure - 17,480 SF
Design
$9,000,000 CJ est. value
Liberty, MO 64068

Holiday Inn Express - Summit Street / Kansas City
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Kansas City, MO 64118

Eye Center of Gladstone
New Construction, Infrastructure
Sub-Bidding
$1,000,000 CJ est. value
Gladstone, MO 64118

Testing and Repair of Backflow Preventers
Term Contract
Post-Bid
Kansas City, MO

On-Call Sanitary Sewer, Storm Sewer and Water Line Repair Services
Infrastructure
Post-Bid
North Kansas City, MO

Intersection Improvements
Results
Gladstone, MO 64119

2021 Mill and Overlay Program
Results
Gladstone, MO

Ford Motor Company Stamping Plant / Liberty
Addition, Demolition, Infrastructure - 55,000 SF
Construction
$6,424,320 CJ est. value
Liberty, MO 64068

Commerce Bank - Liberty Bell Circle / Liberty
New Construction, Infrastructure - 7,000 SF
Construction
$2,000,000 CJ est. value
Liberty, MO 64068

Liberty Self-Storage
New Construction, Infrastructure
Pending Verification
$14,000,000 CJ est. value
Liberty, MO 64068

Eagle Valley Mixed-Use / Kansas City
New Construction, Infrastructure - 51,500 SF
Pending Verification
$212,000,000 CJ est. value
Kansas City, MO 64157

Bardeaux Oaks Subdivision Paving - 0429-SUB4 - City of Yuma
Infrastructure
Conception
$325,000 CJ est. value
Holt, MO 64048

Elkhorn Elementary Addition and Renovations project
Addition, Demolition, Renovation, Infrastructure
Design
$7,000,000 CJ est. value
Excelsior Springs, MO 64024

Last Updated 03/31/2023 09:03 AM
Project Title

I-8 North Frontage Road, Ave10E to Fortuna Road & Los Amigos and Southern Sands Drainage and Pavement Improvements

Physical Address View project details and contacts
City, State (County) Holt, MO 64048   (Clay County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $7,275,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

I-8, North Frontage Road, Ave 10E to Fortuna Road, CIP No. 1.1302 and Los Amigos and Southern Sands Drainage & Pavement Improvements, CIP No. 1.1901 and No. 3.1902 Each bid must be submitted in accordance with the Project's Proposal Pamphlet and on the forms provided therein including, the non-collusion affidavit and a certified or cashier's check or bid bond in the amount of ten percent of the total amount of the bid. The proposed work is located at I-8, North Frontage Road, Ave 10E to Fortuna Road and along Avenida Compadres including in the Los Amigos and Southern Sands Subdivisions. The work consists of, but is not limited to roadway excavation, retention basins, storm drain system, paving, curb & gutter, sidewalks, signing and striping The amount programmed for the base bid is $6,200,000. The project shall be complete and in place within 305 calendar days. All bids must be in a sealed envelope and plainly marked: "I-8, North Frontage Road, Ave 10E to Fortuna Road, CIP No. 1.1302 and Los Amigos and Southern Sands Drainage and Pavement Improvements, CIP No. 1.1901 and 3.1902". The Yuma County Board of Board of Supervisors and Flood Control District reserves the right to reject any or all bids and to waive any informalities or irregularities in a bid, as it may deem in the best interest of the County. The project manager for this Project is Jason Giard, Department of Engineering, 2351 W. 26th Street, Yuma, Arizona 85364. Direct questions in writing or email jason.giard@yumacountyaz.gov. All inquiries from bidders shall be sent in writing via email or carrier service prior to 72 hours of the scheduled bid opening. No inquiries will be accepted after this time. PROJECT LOCATION: Both projects are located in Yuma County, Arizona. The proposed work is located on the I-8, North Frontage Road, Ave 10E to Fortuna Road and along Avenida Compadres including in the Los Amigos and Southern Sands Subdivisions. (Section 6, T09S, R21W) GENERAL DESCRIPTION: A brief description of the work to be performed includes: I-8 North Frontage Road, Ave. 10E to Fortuna Road - o Remove the existing rural 2-lane road and reconstruct to a 3-lane road, with curb, sidewalk, and bicycle lanes on both sides of the new roadway. o Install a wide shoulder along the south side of the new roadway, add dedicated right and left turn bays at all intersecting streets, and a center left turn bay for all driveway access points. o Install a storm drain system with one new detention basin and enlarge an existing basin. o This project has acquired the full right-of-way width to accommodate the future urban 5-lane road section. Los Amigos and Southern Sands Drainage and Pavement Improvements - o Install a storm drain system along Avenida Compadres, which provides flood relief for both subdivisions, and outfalls into the new detention basin being constructed on the North Frontage Road project. o Pavement improvements include removing the existing asphalt surfacing and ABC base and replacing it with 3" of A/C pavement and 8" of ABC base on Avenida Compadres, 3" of A/C pavement and 6" of ABC on all roads in the Southern Sands subdivision and 2 1/2 " of AC pavement and 6" of ABC base in the Los Amigos subdivision. South Frontage Road Median and Bullnose Improvements - o These improvements are on the South Frontage Road at a driveway immediately west of Fortuna Road. o Improvements include removing the existing flexible traffic delineator posts and replacing them with curbs and a red stamped concrete safety median in the center of the South Frontage Road. Also included is a right-in right-out concrete island, signing, and thermoplastic striping. Fortuna Road Median Safety Improvements o Extend the existing six-foot wide concrete median on Fortuna Road south for 190 feet to East 34th Place. o Improvements include removing the existing flexible traffic delineator posts and replacing them with curbs and a red stamped concrete safety median in the center of Fortuna Road. It will include signing, thermoplastic striping, and median scuppers for drainage. #019-0207

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents