Reported 07/25/2019 12:00 AM
Project Title

Construction of Tangier Island Jetty

Physical Address View project details and contacts
City, State (County) Tangier, VA 23440   (Accomack County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description The Norfolk District, Corps of Engineers is seeking qualified, experienced firms capable of constructing approximately 685 foot of jetty structure consisting of Type 1 (VDOTRBS) riprap/armor stone, Class III (VDOTRBS) riprap/core stone, placement of geotextile fabric, placement of marine mattresses, placement of excavated material in an adjacent placement area, and any incidental work related to construction as well as pre and post construction surveys of the project area. The project will require use of a turbidity curtain and/or AquaDam during construction. The project will have approximately 260 feet of jetty structure constructed on or near land in a marsh/shoreline environment and approximately 425 feet constructed in deeper water. The maximum width of the jetty structure is approximately 71 feet. The project site is located on Tangier Island, approximately 13 miles southwest of Crisfield, MD and approximately 15 miles directly east of Reedville, VA within the Chesapeake Bay. The project site is located along the entrance channel on the west side of Tangier Island, VA. The opening is approximately 500 feet wide with the channel exiting the opening and veering left as you approach open water of the Chesapeake Bay. The northern shore is remote due to the lack of infrastructure as well as the lack of inhabitants. The southern shore includes a small harbor as well as the northern tip of the seawall installed along the Tangier Airport. The water depth in the area of the project site ranges from -9 feet MLLW to 2 feet MLLW. The contractor is expected to work in the vicinity of navigation traffic along the Tangier Channel. Placement of materials dredged to complete the project will be placed in an authorized placement area adjacent to the project site.
Details
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Erosion and Sedimentation Controls, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Shoreline Protection, Waterway Construction and Equipment, Marine Construction and Equipment, Dam Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents