Similar Projects
Tuscan Neighborhood Park - WCE901 - City of Elk Grove
Infrastructure
Conception
$5,383,000 CJ est. value
Elk Grove, CA 95624

Folsom Plan Area Fire Station #34 - City of Folsom
New Construction, Infrastructure
Conception
$10,800,000 CJ est. value
Folsom, CA 95630

Phan Apartment Homes At Sierra Vista Park
New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Sacramento, CA 95823

Valley Rail Project / Altamont Corridor Express- San Joaquin Joint Power Authority
Infrastructure
Design
$404,000,000 CJ est. value
Sacramento, CA 95814

Alta Mesa Road Bridge Replacement at Laguna Creek
Demolition, New Construction, Infrastructure
Bidding
$6,482,960 CJ est. value
Herald, CA 95638

Alta Mesa Road Bridge Replacement at Laguna Creek
Demolition, New Construction, Infrastructure
Bidding
$6,482,960 CJ est. value
Herald, CA 95638

RFQ Engineering - Design Services for Merced to Madera
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Sacramento, CA 95814

RFQ Engineering - Design Services for Merced to Madera
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Sacramento, CA 95814

Power Line Road Improvement Project - Phase 1.5B
Infrastructure
Results
$4,300,000 est. value
Sacramento, CA

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

3S Apartments
Demolition, New Construction, Infrastructure - 2,300 SF
Construction
$71,500,000 CJ est. value
Sacramento, CA 95811

Sunrise Mall Redevelopment
New Construction, Infrastructure - 695,000 SF
Pending Verification
$400,000,000 CJ est. value
Citrus Heights, CA 95610

Ice Box
New Construction, Infrastructure - 79,190 SF
Pending Verification
$25,000,000 CJ est. value
Sacramento, CA 95811

Laguna Boulevard Right Turn Lane to West Stockton Boulevard - WTR058 - City of Elk Grove
Infrastructure
Conception
Elk Grove, CA 95758

Victory Avenue Apartment / Flemings Highway Farms
New Construction, Infrastructure
Design
$28,000,000 CJ est. value
Sacramento, CA 95828

Last Updated 08/15/2023 05:20 PM
Project Title

Laguna Creek and Whitehouse Creek Multi-Functional Corridor Project - WDR018 - City of Elk Grove

Physical Address View project details and contacts
City, State (County) Elk Grove, CA 95624   (Sacramento County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected July 2025
Bids Due View project details and contacts
Estimated Value $3,164,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will consist of three phases of construction of a 2.2 mile reach along Laguna and Whitehouse Creeks. Phase I will construct a maintenance access road (paved with no striping) for access to Laguna and Whitehouse Creeks. Phase II will transition the maintenance access road to a Class 1 multi-use trail. Phase III will preserve, rehabilitate and enhance the creeks and adjacent wetlands.The project is east of State Route 99, along Laguna Creek to Camden Lake and along Whitehouse Creek from Laguna Creek north to East Stockton Blvd. As of August 2023, the project is currently in the FY 2021-2026 CIP. The project is in the right-of-way acquisition. The project is expected to bid in the spring of 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents