Similar Projects
WWTP Consolidation Project Phase III
New Construction
Conception
$4,000,000 est. value
Pasadena, TX 77505

Wildhorse Ranch Wastewater Treatment Plant Expansion
Addition
Conception
$35,000,000 est. value
Austin, TX 78653

Dallas Salmon Wastewater Treatment Plant Operations Center
New Construction - 10,000 SF
Design
$5,003,625 est. value
League City, TX 77573

Wastewater Treatment Plant Chlorination / Dechlorination Improvements
Renovation
Bidding
$2,250,000 to $2,750,000 est. value
Tyler, TX 75703

Sabine Creek Wastewater Treatment (WWTP) Expansion to 7 MGD
Addition
Bidding
$3,000,000 est. value
Royse City, TX 75189

0.120 MGD Wastewater Treatment Plant Project
Post-Bid
Woodloch, TX 77385

WWTP Improvements TWDB
Post-Bid
Huntington, TX

Ulitmate Wastewater Treatment Plant Phase 3 Expansion - 0.72 MGD - Construction
Results
$2,100,000 est. value
Houston, TX 77056

Raw Water Supply and Distribution Additions to Edinburg West WTP Reservoir
Results
Less than $1,390,620 est. value
Edinburg, TX 78541

Wastewater Plant Phase One
New Construction
Construction
TX

South Wastewater Treatment Plant Office/Lab Construction
New Construction
Pending Verification
Copperas Cove, TX 76522

New Solid Waste and Recycling Facility
New Construction
Pending Verification
$6,530,000 est. value
Temple, TX

Dessau Wastewater Treatment Plant Capacity Expansion
Addition
Conception
$8,650,000 est. value
Austin, TX

Mountain Creek Regional Wastewater System - Expansion from 4.5 MGD to 6.0 MGD
New Construction, Infrastructure
Bidding
$40,000,000 est. value
Midlothian, TX 76065

Centrifuge Control Panel Replacement at Robinson Creek WWTP
Post-Bid
Huntsville, TX

Last Updated 06/24/2022 03:12 AM
Project Title

Wastewater Treatment Plant Headworks, Clarifier and Return Sludge System Modifications

Physical Address View project details and contacts
City, State (County) Hitchcock, TX 77563   (Galveston County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $350,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove existing automatic bar screen and steel channel box and install two new static screens and stainless steel flow splitter bix with piping modfications. Replace one clarifier drive unit. Install two new air lift pumps for return sludge for the two clarifiers.

Details

Sewage Treatment Plant, Renovation.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Synthesis Gas Cleanup and Handling Equipment.
Division 46 - Water and Wastewater Equipment, Clarifier Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents