Similar Projects
HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

IVHM FY21 Boiler Exhaust Replacement
Results
Manteno, IL

Upgrade Steam And Condensate Lines
Results
Less than $15,000,000 est. value
Kankakee, IL

Weatherization (IHWAP) Program
Term Contract
Post-Bid

Miscellaneous Cutting Tools & Abrasives
Term Contract
Results

Weatherization Program
Term Contract
Post-Bid
IL

Aerial Spraying of Aquatic Glyphosate Herbicide
Term Contract
Results

Weatherization Program
Term Contract
Post-Bid
IL

PAV HA 6th Floor Lab - RO System Upgrade BP-02 (GC)
Alteration
Results
Lexington, KY 40506

Mechanical Replacement Work at Multiple Middle Schools
Alteration
Post-Bid
Kankakee, IL 60901

Rooftop Unit Replacement
Alteration
Results
Bourbonnais, IL 60914

QBS DOIT Professional Fiber Engineering Services
Renovation, Infrastructure
Post-Bid

High School RTU Replacement and Controls Upgrade
Alteration
Results
Manteno, IL 60950

DHS SP - FY22 Pest Control Services
Alteration
Post-Bid
Kankakee, IL

Last Updated 05/17/2022 04:59 PM
Project Title

FY22 Replacement of Fan Coil Units on Building 704 - Shapiro

Physical Address View project details and contacts
City, State (County) Kankakee, IL 60901   (Kankakee County)
Category(s) Single Trades
Sub-Category(s) HVAC, Service/Term Contracts
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal and replacement of all existing fan coil units at Building 704. Building 704 currently heats and cools the building using a 4-pipe system fan coil unit in each room. This project calls for the removal of ALL existing fan coil units and replace with new 4-pipe fan coil units of similar size and construction; New units shall have new fan speed/temperature controls and control valves located in unit; There are approximately 119fan coil units that are to be replaced that come in four different lengths: 67" (qty: 40); 56 1/2"(qty: 7); 48" (qty: 59); 38 1/2" (qty: 13); Contractor is responsible for verifying count and sizes; First filter for each unit must be supplied with fan coil; Any pipe insulation that is removed must be replaced; Contractor is responsible for removing ALL old equipment and/or parts and discard off site from Shapiro Center.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents