Similar Projects
USDA ARS Laboratory
Demolition, New Construction, Infrastructure
Bidding
$100,000,000 CJ est. value
Tifton, GA 31793

USDA ARS Laboratory
Demolition, New Construction, Infrastructure
Bidding
$100,000,000 CJ est. value
Tifton, GA 31793

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Commerce Way Redevelopment Project
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Tifton, GA 31794

Old Ocilla Road Turn Lane Modifications and Bowen Road Improvements
Infrastructure
Results
$282,764 CJ est. value
Tifton, GA 31794

Old Ocilla Road Turn Lane Modifications and Bowen Road Improvements
Infrastructure
Results
$282,764 CJ est. value
Tifton, GA 31794

Ferry Lake Road at New River Church Road Intersection Improvements
Infrastructure
Bidding
$1,000,000 CJ est. value
Tifton, GA 31794

FY2022 LMIG Waterline Replacements
Infrastructure
Post-Bid
$300,000 est. value
Tifton, GA

Water, Sewer and Street & Drainage Improvements to serve the West Phillipsburg Community
Infrastructure
Results
$6,719,579 CJ est. value
Tifton, GA 31794

Development of Rural Workforce Housing
New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Tifton, GA 31794

Len Lastinger Elementary School Renovations
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$250,000 CJ est. value
Tifton, GA 31794

Adams Road Culvert Improvements
Infrastructure
Post-Bid
$80,000 CJ est. value
Tifton, GA 31733

2022 and 2023 Local Maintenance Improvement Grant (LMIG) 2023 Addl. Local Maintenance Improvement Grant (LMIG)
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Omega, GA 31775

Express Oil Change / Tifton
New Construction, Infrastructure - 5,670 SF
Post-Bid
$1,500,000 CJ est. value
Tifton, GA 31793

ARPA Water Main Replacements
Infrastructure
Post-Bid
$800,000 CJ est. value
Tifton, GA 31794

Last Updated 10/09/2023 02:35 PM
Project Title

Magnolia Drainage Improvements

Physical Address View project details and contacts
City, State (County) Tifton, GA 31794   (Tift County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $660,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Magnolia Drainage Improvements Any other questions can be directed to the issuing office, ESG Engineering, Inc. Margaret Hildebrand mhildebrand@esgengineering.com or 478-474-4996 ext. 239. No bid may be withdrawn after the closing time for the receipt of bids for a period of sixty (60) days. Work To Be Done: The work shall generally consist of furnishing all products and performing all labor necessary to install the following (see Plans and Specifications for complete details and description): The project includes but is not limited to: repair/rehabilitation of existing 96"-108" CMP stormwater pipe joints using internal joint seals, removal of two +-30 LF sections of 108" corrugated metal pipes (CMP) to be replaced with two +-30 LF sections of aluminized CMP; removal and replacement of +-40 LF of curb; removal and replacement of +-175 SF of asphalt parking areas; repair of existing voids at CMP joints (96" and 108") by cementitious grout injection, sand/sediment removal at select areas within the culverts, and other associated work including, but not limited to, traffic control, erosion control, and materials testing. Any Contractor submitting a bid must be licensed by the State of Georgia. Bids shall be accompanied by a bid bond or certified cashier's check in an amount not less than 5% of the base bid. See Instructions to Bidders for additional bidding requirements. . Performance and Payment Bonds, each in an amount equal to 100% of the contract price shall be required of the successful bidder if contract is awarded. The City of Tifton reserves the right to reject any or all Bids, including without limitation, the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional bids and to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner. For questions on this bid advertisement, contact Margaret Hildebrand, ESG Engineering, Inc., mhildebrand@esgengineering.com or 478-474-4996 ext. 239.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents