Similar Projects
West End Regional Pond & Trunk Oversizing - CIP - STORM-18-007 - City Of Shakopee
Infrastructure
Conception
$400,000 CJ est. value
Shakopee, MN 55379

CIP - Blue Lake Channel (East) Regional Storm Pond - Storm-21-002 - City of Shakopee
Infrastructure
Conception
$675,000 CJ est. value
Shakopee, MN 55379

Rapid Marine Expansion
Demolition, New Construction, Infrastructure, Renovation - 27,000 SF
Design
$7,600,000 CJ est. value
Shakopee, MN 55379

Innovation Center/Incubator - BA-20-005 - City of Shakopee
New Construction, Infrastructure - 36,000 SF
Design
$12,000,000 CJ est. value
Shakopee, MN 55379

Quarry Lake Outlet Project
Infrastructure
Post-Bid
$463,975 CJ est. value
Shakopee, MN 55379

Village Commerce Parking Lot Improvements
Infrastructure
Post-Bid
$500,000 CJ est. value
Prior Lake, MN 55372

Grading, Cold Inplace Recycling, Bituminous Mill and Overlay, and Lighting; Grading, Bituminous Surfacing, Roundabout, ADA Improvements, and Lighting
Infrastructure
Results
$9,888,888 CJ est. value
Jordan, MN 55352

Scott County CDA Belle Haven-Britland Apartments Re-Bid
New Construction, Infrastructure
Results
$496,995 CJ est. value
Belle Plaine, MN 56011

Minnesota Mash Baseball Facility
New Construction, Infrastructure - 67,768 SF
Construction
$15,700,000 CJ est. value
Savage, MN 55378

Riley Road and James Parkway Subdivision
New Construction, Infrastructure
Pending Verification
$35,000,000 CJ est. value
Elko New Market, MN 55020

70th Street Speculative Warehouse
New Construction, Infrastructure - 506,000 SF
Pending Verification
$53,000,000 CJ est. value
Shakopee, MN 55379

2024 Full-Depth Pavement Reconstruction - CIF-24-001 - City of Shakopee
Infrastructure
Conception
$1,525,000 CJ est. value
Shakopee, MN 55379

Canterbury Park Amphitheater
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Shakopee, MN 55379

Pumphouse 23
Renovation, Infrastructure
Post-Bid
$4,478,000 CJ est. value
Shakopee, MN 55379

2022 Pavement Rehabilitation Prior Lake-Savage Area Schools
Infrastructure
Results
$780,217 CJ est. value
Prior Lake, MN 55372

Last Updated 10/18/2023 07:02 AM
Project Title

West Booster Station Improvement Project

Physical Address View project details and contacts
City, State (County) Savage, MN 55378   (Scott County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $2,128,400 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Site Directions: Southwest corner of Trunk Highway 13 and McColl Drive City Project No. 22-35 West Booster Station Improvement Project Major Items Contract Items Qty Unit Selective Demolition 1 Lump Sum HVAC 1 Lump Sum Motor Control Centers (MCC) 1 Lump Sum Program Logic Controls 1 Lump Sum Pumps & Motors 4 Each Flow Meters 1 Lump Sum Flow Control Valves 1 Lump Sum Plans and specifications No bids will be considered unless accompanied by a bidder's bond naming the City of Savage as obligee certified check payable to the City Clerk of the City of Savage or a cash deposit equal to at least five percent (5%) of the amount of the bid, which shall be returned or forfeited as set forth in the Information for Bidders The Council reserves the right to retain the deposits of the three lowest bidders for a period not to exceed sixty (60) days after the date and time set for the opening of bids. The City Council reserves the right to reject any and all bids, waive irregularities and informalities therein and further reserves the right to award the contract in the best interests of the City

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents