Similar Projects
South Clark Street Bridge Over Blackhawk Creek - FP004 - City of Davenport
Infrastructure
Conception
$770,000 est. value
Davenport, IA 52805

Eastern Avenue Bridge at Goose Creek - FP005 - City of Davenport
Renovation, Infrastructure
Conception
$440,000 est. value
Davenport, IA 52805

Pedestrian Curb Ramp Retrofit Program
Infrastructure
Bidding
$300,000 CJ est. value
Davenport, IA 52801

Pedestrian Curb Ramp Retrofit Program
Infrastructure
Bidding
$300,000 CJ est. value
Davenport, IA 52801

All Inclusive Swing at Vander Veer Park
Infrastructure
Sub-Bidding
$50,000 CJ est. value
Davenport, IA 52803

Hillandale Road and North West Boulevard, 76th Street and North West Boulevard
Infrastructure
Post-Bid
Davenport, IA 52805

PCC Patching
Infrastructure
Post-Bid
IA

Indiana Avenue Friction Seal
Infrastructure
Results
Bettendorf, IA

23rd Street Reconstruction
Infrastructure
Results
Bettendorf, IA

West Loop Phase I - 28029 - City Of Davenport
Infrastructure
Conception
Davenport, IA

Scott Community College - Belmont Campus Allied Health Wing CTE Addition and Remodel
Addition, Demolition, Build-out, Infrastructure
Bidding
Riverdale, IA 52722

Pleasant View ES 2022 Access Drive Improvements
Infrastructure
Post-Bid
Bettendorf, IA 52722

Marquette and West 12th Street Replacement
Infrastructure
Results
Davenport, IA

Skate Park Repairs and Pump Track - 64115 - City of Davenport
Renovation, Infrastructure
Conception
$300,000 est. value
Davenport, IA

Mound Street Pavement Resurfacing Project
Infrastructure
Bidding
$300,000 CJ est. value
Davenport, IA 52803

Last Updated 08/02/2022 01:04 PM
Project Title

Middle Road Pedestrian Bridge - City of Bettendorf

Physical Address View project details and contacts
City, State (County) Bettendorf, IA 52722   (Scott County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Obtained from a credible source, Awaiting verification, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project calls for the construction of a pedestrian bridge across Middle Road in northern Bettendorf. As of August 2, 2022, this project is in the conceptual phase. Information regarding design team and contractor selection has not been disclosed. A firm timeline for construction has not been established. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents