Similar Projects
Pineville Elementary Sidewalks
Infrastructure
Design
$1,000,000 CJ est. value
Woodworth, LA 71485

Elliott St. Rehab: Macarthur Dr to I-49
Infrastructure
Design
$2,500,000 CJ est. value
Alexandria, LA 71301

New Administration and Emergency Operations Building Camp Beauregard, Pineville, Louisiana
New Construction, Infrastructure - 9,460 SF
Bidding
$3,000,000 CJ est. value
Pineville, LA 71360

Cedar Lake Pump Station Reconstruction
Demolition, New Construction, Infrastructure
Bidding
$5,850,000 CJ est. value
Pineville, LA 71360

Henry Road Safety Widening: LA 73 To Tillotson and Aikens Road Clearing and Grubbing
Infrastructure, Alteration
Post-Bid
$350,000 to $500,000 est. value

Construction of Site Work
Infrastructure
Post-Bid
Alexandria, LA

Extension of Runway 18 and Associated Improvements Phase 1
Infrastructure
Results
$3,200,000 est. value
Alexandria, LA

Cheatham Park Baseball Field Improvements (Artificial Turf)
New Construction, Infrastructure
Results
$250,000 est. value
Alexandria, LA

Project Diamond Vault
New Construction, Infrastructure
Pending Verification
$900,000,000 CJ est. value
Lena, LA 71447

LA 623: US 165 to Camp Livingston Rd
Infrastructure
Design
$250,000 CJ est. value
Ball, LA 71405

Water Works District No. 3 of Rapides Parish Contract No. 1 Two (2) Water Wells at Headquarters Site
Infrastructure
Bidding
$200,000 CJ est. value
Ball, LA 71405

New Administration, Emergency Operations and Warehouse Building, Camp Beauregard - Louisiana Engineering Selection Board
New Construction, Infrastructure
Post-Bid
$3,360,000 CJ est. value
Pineville, LA 71360

ARPA/WSP Sieper Consolidation Improvements Contract 1 Distribution and Sitework project
Infrastructure
Results
$1,994,672 CJ est. value
Elmer, LA 71424

LA 1: Rapides Station - I-49 Bridge
Infrastructure
Design
$5,000,000 CJ est. value
Alexandria, LA 71301

Army Combat Fitness Test (ACFT) Field, Camp Cook
New Construction, Infrastructure
Post-Bid
$677,250 CJ est. value
Ball, LA 71405

Last Updated 01/24/2023 11:06 PM
Project Title

Rehabilitation of Runway and Taxiway Safety Areas Phase 2 Light Adjustments

Physical Address View project details and contacts
City, State (County) Alexandria, LA 71303   (Rapides County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $2,108,800 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

** As of November 23, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** If forwarded by mail, the sealed envelope containing the bid must be enclosed in another envelope addressed to the England Economic and Industrial Development District, 1611 Arnold Drive Building 1803, Alexandria, LA 71303. Each bid must be accompanied by bid security made payable to Owner in an amount of 5 percent of bidder's maximum bid price and in the form of a certified check, cashier's check or a bid bond. The successful bidder will be required to obtain a Performance Bond and a Payment Bond each in the amount of 100% of the contract amount. All bonds shall be executed by such sureties as are named in U.S. Department of the Treasury Circular 570. A bond signed by an agent or attorney-in-fact must be accompanied by a certified copy of that individual's authority to bind the surety. Bidders may not withdraw their bid within forty-five (45) days after the actual date of opening thereof. The Owner reserves the right to reject any and all bids for just cause in accordance with Louisiana R.S. 38:2214B. Bidders shall have the option to submit bids electronically through a uniform and secure electronic interactive system. Those seeking to submit bids electronically shall register online and shall follow such procedures as are established by Central Auction House, and will be charged a fee. In addition, contractors shall be required to obtain a digital signature certificate prior to submitting bids online. Proper and timely submission of an electronic bid is the responsibility of the Bidder. Bidders are encouraged to complete the electronic bid documents in advance of bid closing. Late bids due to malfunction of internet infrastructure, certificate service providers, electronic bid bond providers, or other interruptions shall not be accepted. The England Authority is not responsible for damages, lost revenue, etc., for bids not timely received due to malfunctions or breakdown of Central Auction House. Telephone or facsimile bids are invalid and shall not receive consideration. The owner's electronic address is kwells@englandairpark.org. The requirements of 49 CFR Part 26, Regulations of the U.S. Department of Transportation, apply to this contract. It is the policy of the England Economic and Industrial Development District (EEIDD) to practice nondiscrimination based on race, color, sex or national origin in the award or performance of this contract. All firms qualifying under this solicitation are encouraged to submit bids/proposals. DBE Required Contract Provisions: Contract Assurance (26.13) - The contractor or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The contractor shall carry out applicable requirements of 49 CFR Part 26 in the award and administration of this contract. Failure by the contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy, as the EEIDD deems appropriate. Prompt Payment (26.29) - The prime contractor agrees to pay each subcontractor under this prime contract for satisfactory performance of its contract no later than 15 days from the receipt of each payment the prime contractor receives from EEIDD. The prime contractor agrees further to return retainage payments to each subcontractor within 15 days after the subcontractor's work is satisfactorily completed. (The EEIDD will hold retainage from prime contractors and provide for prompt and regular incremental acceptances of portions of the prime contract and pay retainage to prime contractors based on these acceptances). Any delay or postponement of payment from the above referenced time frame may occur only for good cause following written approval of the EEIDD. This clause applies to both DBE and non-DBE subcontractors. Bidders are hereby advised that the Owner, England Economic and Industrial Development District, has employed the services of Eddlemon & Associates LLC to administer the Disadvantaged Business Enterprise Program for this project. The DBE Administrator's address is 5237 Raphael Drive; Alexandria, Louisiana 71303 and the telephone number is (318) 613-8143.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents