Similar Projects
LiDestri Conveyor Bridge System & Tank Farm Expansion
New Construction
Design
Rochester, NY 14606

Design Build Services for Lower Westchester Bridge Bundle
Post-Bid
$100,000,000 est. value
NY

CR 114 (Master Street) Over the Powamppokonk Creek Bridge Replacement (BIN 3304080)
Term Contract
Post-Bid
Schaghticoke, NY 12154

Titus Towers Bridge, Creek, and Sidewalk
Results
Less than $223,000 est. value
Ithaca, NY 14850

Joint Replacement of Dr Johnson Road (CR 64) Bridge Over the Batten Kill and Cemetery Road Bridge Over Black Creek
Results
Less than $500,000 est. value
Cambridge, Salem, NY

Albright-Knox Gundlach Art Museum AK360 Expansion
New Construction - 29,000 SF
Construction
$155,000,000 est. value
Buffalo, NY 14222

Asteri Ithaca Mixed-Use
New Construction, Addition - 200,000 SF
Construction
$46,368,000 est. value
Ithaca, NY 14853

Replacement of County Route 18 Bridge Over Prendergast Creek in the Town of North Harmony
Term Contract
Post-Bid
Mayville, NY 14757

Cedar Street BR (261-01) Over Ledge Creek Replacement
Results
Buffalo, NY 14202

Replacement of Bridge PV-17 (Bin 3343590) Mill Lane, Over Unnamed Creek
Post-Bid
Pleasant Valley, NY 12569

NYS Route 28 over Esopus Creek Bridge Replacement Project
Results
Shandaken, NY 12480

Bridge Rehabilitation of Wurts St. Over Rondout Creek
Post-Bid
Less than $40,000,000 est. value
Kingston, NY 12401

Replacement of New Albion Bridge 35, Tannery Street Over Tributary South Branch Cattaraugus Creek
Term Contract
Results
Little Valley, NY 14755

Rehabilitation Fitzelle Hall Pedestrian Bridge
Post-Bid
Oneonta, NY 13820

Rehabilitation of I-90 Bridges Over Fuller Road and Erie Boulevard/Canadian Pacific RR in the City of Albany
Results
Less than $5,800,000 est. value
Albany, NY 12201

Last Updated 05/24/2021 08:06 AM
Project Title

Bridge Replacement CR13 Barkersville-Fayville Road Over Cadman Creek

Physical Address View project details and contacts
City, State (County) Ballston Spa, NY 12020   (Saratoga County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of the complete replacement of the existing bridge. The work includes the removing and disposing of the existing corrugated steel arch bridge, and removal of the existing concrete substructures. New construction will consist of the installation of three-sided rigid frame units, cast-in-place concrete wingwalls and headwalls, a new bridge foundation consist of cast-in-place concrete footings founded on piles, and the associated approach highway reconstruction work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents