Similar Projects
Tonto Creek Bridge
New Construction, Infrastructure
Bidding
$23,920,000 est. value
Tonto Basin, AZ 85553

Runway 3L-21R Lighting and Signage and 3L-21R PAPI Relocation
Infrastructure
Bidding
$750,000 est. value
Prescott, AZ 86301

Airfield Guidance Signage
Post-Bid
Mesa, AZ

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Bridge Deck Replacement
Results
Less than $1,900,000 est. value
Tuba City, AZ

Bridge Deck Replacement
Results
Less than $1,900,000 est. value
Tuba City, AZ

North West Region (I40 & I-17) (Nw Regionwide Wrong Way Signs)
Infrastructure
Bidding
$880,000 est. value
Mayer, AZ 86333

AZ FS 24(1) Buffalo Crossing Bridge
New Construction
Post-Bid
Duncan, AZ

Construct Bridge Rehabilitation
Results
Less than $2,500,000 est. value
AZ

Street Signs and Hardware
Alteration
Post-Bid
Peoria, AZ

Bridge Deck Replacement
Results
Less than $2,200,000 est. value
Nogales, AZ 85600

Sfs Lot Bollards
Term Contract
Post-Bid
Phoenix, AZ

Design Build Services for Interpretive Displays at Reid Park Zoo
Results
Less than $750,000 est. value
Tucson, AZ 85701

Striping
Infrastructure
Post-Bid
Parker, AZ

Annual Maintenance for Pavement Marking, Installation, Removal and Rumble Strip Maintenance Statewide
Results

Reported 06/02/2022 12:00 AM
Project Title

Maintain ParkWide Bridges,Culverts and Guardrails

Physical Address View project details and contacts
City, State (County) Bullhead City, AZ   (Mohave County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Highway Signs/Guardrails/Barriers
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $25,000 to $100,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work for this contract consists of: A. See pictures at the end of these specifications for existing site conditions and visual site conditions. B. See Location Maps at the end of the specifications for locations of the sites. C. Onsite - Clear the site and mobilize. D. Work on the Guardrails consists of the following: 1. Northshore Road i. Remove and replace 8 treated wood posts. ii. Remove and replace 8 treated wood offset blocks. iii. Remove and replace 6 sections of Corten W-beam guardrails. iv. Replace guardrail reflectors as needed

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Culverts.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents