Similar Projects
SB Northwestern Pathway-Lahser to Civic Center
Infrastructure
Bidding
Southfield, MI

BP 6 Birney Parking Lot and Track Field
Post-Bid
Southfield, MI 48076

CDBG ADA Sidewalk Ramp Installation
Post-Bid
Milford, MI

Rest Areas and Welcome Centers Across the State
Term Contract
Results

Innovation Hills Kayak Landing
Results
Rochester Hills, MI 48309

2020 Safety Path Program
Post-Bid
MI

FY 2019 CDBG Sidewalk Ramp Improvements
Results
Less than $36,785 est. value
Clawson, MI

Rest Area ADA Improvement Eastern Lower Peninsula
Post-Bid

Civic Center Drive Reconstruction
Results
Less than $365,000 est. value
Waterford, MI 48329

Bike Racks for Sidewalks
Post-Bid
Wixom, MI

Public Safety Campus Expansion, Phase II
Results
Walled Lake, MI

Woodland Elementary Sidewalk Replacement
Post-Bid
Auburn Hills, MI

Parking Lot Maintenance Program
Results
Troy, MI

Rest Area ADA Improvement Eastern Lower Peninsula - Interior
Post-Bid

2020 Sidewalk Project
Results
Ortonville, MI 48462

Last Updated 11/01/2021 08:58 AM
Project Title

2021 Safety Path Program

Physical Address View project details and contacts
City, State (County) Bloomfield Hills, MI 48301   (Oakland County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Division A – Telegraph Road, East Side, 14 Mile Road to Lincoln Road: Construct approximately 10,800 sft of 4” and 6” thick concrete safety path and ADA ramps/landings, 105 syd of concrete drive approaches, miscellaneous landscaping, and other items for a complete project Division B – Lahser Road, West Side, 14 Mile Road to Lincoln Road: Construct approximately 11,275 sft of 4” and 6” thick concrete safety path and ADA ramps/landings, 340 syd of concrete drive approaches, 44 tons of asphalt, 848 ft of concrete curb & gutter, 586 ft of 12” storm sewer, 6 catch basins and inlets, tree and miscellaneous landscaping, and other items for a complete project

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents