Similar Projects
Group 4-17-ST 8
Infrastructure, Alteration
Conception
$5,114,012 est. value
Hawley, PA

PA 41 and SR 841 Improvements
Infrastructure
Conception
$5,520,000 CJ est. value
West Grove, PA 19390

Steeple View II - LCB Assisted Living
Demolition, New Construction, Infrastructure - 12,000 SF
Design
$3,200,000 CJ est. value
Newtown, PA 18940

SR 54 Corridor Safety Improvement
Infrastructure
Design
$20,483,190 CJ est. value
Mahoning Township, PA 17821

Royer SR 2020 Piney Creek Bridge
Demolition, New Construction, Infrastructure
Bidding
$2,500,000 CJ est. value
Catharine Township, PA 16693

Bryansville Road Bridge
Demolition, New Construction, Infrastructure
Bidding
$2,500,000 CJ est. value
Delta, PA 17314

Site Improvements at the Walsh Plaza Development PA38-18 Phase 2 - Site Improvements
Post-Bid
Dunmore, PA

Site Improvements at Erie County 911 Building
Infrastructure
Post-Bid
Erie, PA 16509

New Borough Administration, Police and Community Center - All Site Work
New Construction
Results
Trainer, PA 19061

Site Preperation
Infrastructure
Results
$1,033,630 to $1,332,180 est. value
Lititz, PA 17543

Juniata County Industrial Park Expansion
Construction
Mifflintown, PA 17059

South Gulph Road Hotel Renovation
Infrastructure, Renovation - 30,323 SF
Pending Verification
$8,000,000 CJ est. value
King of Prussia, PA 19406

ACBP Conservancy Lane Business Park
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Greencastle, PA 17225

SR 3004 Brdg/Crooked Ck
Renovation, Alteration
Conception
$1,170,000 est. value
Cochranton, PA 16314

Brownstown Area Road Reconstruction Project
Infrastructure
Design
$300,000 CJ est. value
Kiskiminetas Township, PA 15686

Last Updated 09/12/2022 07:33 PM
Project Title

Canal Street Pump station

Physical Address View project details and contacts
City, State (County) Flemington, PA 17745   (Clinton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $181,500 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project will include demolition of the existing pump station building and equipment, installation of a new wet well and plumbing connections, installation of a Borough supplied submersible package pump station, bypass pumping and surface finishes at the site. The Borough requires the project to be Substantially Complete within 60 days of Notice to Proceed. Sealed Bids will be received by the Borough of Flemington for improvements to the Canal Street Pump station. The Borough will receive sealed Bids at 126 High Street, Suite 1, Flemington, PA 17745, when the sealed bids will be opened and read aloud in Borough Council Chambers. Bid Documents may be viewed at the office of the Engineer or at the Borough Office during regular business hours. All inquiries pertaining to the Bidding Documents shall be directed to the Engineer in writing via email (sgibson@mctish.com) or via FAX (570-368-3166). Bids will be required to be submitted under a condition of irrevocability for a period of 60 days after submission. No Bidder may withdraw his Bid before the expiration of the 60 day period. Bidders need to register with MKA before submitting a bid. The Owner reserves the right to accept or reject any or all Bids.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents