Similar Projects
Rehabilitation Taxiway B North - City of Billings
Infrastructure
Conception
$1,320,000 CJ est. value
Billings, MT 59105

Rehabilitation Taxiway B North - City of Billings
Infrastructure
Conception
$1,320,000 CJ est. value
Billings, MT 59105

Y--GAOA - EMDD Fog Seal
Term Contract
Design
$100,000 to $250,000 est. value
Billings, MT 59101

Pompey Pillar National Monument Rock Stabilization
Infrastructure
Design
$5,000,000 CJ est. value
Pompeys Pillar, MT 59064

MetraPark Lower and Expo Lot Project
Infrastructure
Bidding
$100,000 CJ est. value
Billings, MT 59101

MetraPark Lower and Expo Lot Project
Infrastructure
Bidding
$100,000 CJ est. value
Billings, MT 59101

Snow Plowing on Local Streets
Term Contract
Post-Bid
$450,000 est. value
Billings, MT

Pistol Range, Parking & Road Improvements
Alteration
Post-Bid
Billings, MT

Hudson Bay Divide South
Infrastructure
Results

Plant Mix Surfacing
Infrastructure
Results
MT

Shop World 3 Subdivision
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Billings, MT 59106

Public Ramp - Northside Expansion - Phase 2 - City of Billings
Demolition, Infrastructure
Conception
$1,750,000 CJ est. value
Billings, MT 59105

Saint Charles Mission School Parking Lot Reconstruction and Drain Field Replacement
Infrastructure
Design
$570,000 CJ est. value
Billings, MT 59101

HRDC Community First Griffin Place Site and Infrastructure
Demolition, Infrastructure
Post-Bid

Water System Improvements
Infrastructure
Results
Billings, MT 59105

Last Updated 01/17/2023 04:19 PM
Project Title

Mullowney Lane Improvements

Physical Address View project details and contacts
City, State (County) Billings, MT 59101   (Yellowstone County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be completed under this contract generally consists of but is not limited to: Full depth reconstruction of portions of Mullowney Lane, as well as mill and overlay of portions of Mullowney Lane. Installation of new curb and gutter, sidewalks, multi-use path, storm drain system, street lighting, pavement markings, signing, and intersection signaling. Irrigation ditch excavation, regrading, and structures installation. Roadway Lighting, Culverts, Waterways, Stormwater Channels, Sidewalks/Curbs/Gutters, Street/Road Pavement Marking, Drainage, Dredging, Ditches and Canals, Street/Road Asphalt Resurfacing and Milling, Street/Roadway Reconstruction , Paving (Trail Paving), Traffic Control Devices (Signals, Signing, etc.), Stormwater Improvements, Landscaping - Seeding

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents