Similar Projects
US - 89 Victory Road to Davis Co Line
Infrastructure
Bidding
$1,500,000 to $3,000,000 est. value
Salt Lake City, UT 84103

UDOT Pavement and Approach Slab Stabilization and Lifting AVL
Term Contract, Infrastructure
Bidding

800 North Roadway Improvements 450 West to 50 West
Post-Bid
$1,736,000 est. value
Clearfield, Sunset, UT

Country Road Land Drain Project
Post-Bid
Fruit Heights, UT 84037

800 North - 2000 West to 3000 West Project
Results
Clinton, UT 84015

Asphalt Parking Lot Pavement Preventative Maintenance
Results
Farmington, UT 84025

Antelope Animal Hospital Parking Expansion
New Construction, Alteration
Pending Verification
Syracuse, UT 84075

Indefinite Quantity (Idiq) Multiple Award Construction Contract (Macc) For Paving Projects At Various Government Installations Within The Navfac Sw Area Of Responsibility Including But Not Limited To California, Arizona, Nevada, Utah, Colorado, And New Mex
Post-Bid

Micro Seal the Antelope Island Causeway
Results
Fruit Heights, UT 84037

Construction of the Street Crack and Slurry Seal Project
Post-Bid
$250,000 est. value
Centerville, UT 84014

FY 2021 Road Maintenance Project
Results
Farmington, UT 84025

Burke Lane Roadway Project
Post-Bid
Less than $3,000,000 est. value
Farmington, UT 84025

Contract for Untreated Base Course (UTBC) for Pickup in Region 1
Term Contract
Results

2020 Street Maintenance Projects
Post-Bid
Less than $210,000 est. value
UT

2020 Street Maintenance
Results
Less than $498,844 est. value
South Weber, UT 84403

Reported 09/21/2021 12:00 AM
Project Title

Damage Repair SR 67 Mp 8.04 Legacy Parkway

Physical Address View project details and contacts
City, State (County) Centerville, UT 84014   (Davis County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Restore roadway items to pre-incident conditions by repairing damage caused by vehicle and diesel spill in March, 2021. The crash site is located at Mile Post 8.04 on SR 67 Northbound inside lane, outside lane, and both shoulders.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents