Similar Projects
CTH C/ Wilmot Road
Infrastructure
Bidding
$1,400,000 CJ est. value
Bristol, WI 53104

Line of Sight Reconstruction Parking Ramps 38 and 63
Infrastructure
Sub-Bidding
$75,000 CJ est. value
Madison, WI 53715

Beloit Readiness Center Construct Trash Enclosure
Alteration
Post-Bid
Beloit, WI 53511

Concrete Replacement Program
Alteration
Post-Bid
Sturgeon Bay, WI

Townhomes at Carver Park - Metal Roofing, Landscaping, Concrete Repairs and Sidewalk Mudjacking, Parking Area Improvements, Final Remodel Turnover Cleaning
Infrastructure, Alteration
Results
Milwaukee, WI

Building 3.1
Alteration
Results
Milwaukee, WI

Entrance and Terrace Renovation University Center University of Wisconsin - River Falls - GPC
Renovation
Construction
$359,817 CJ est. value
River Falls, WI 54022

Chiller #1 Overhaul Heating & Cooling Plant
Renovation
Construction
$96,975 CJ est. value
Kenosha, WI 53144

Government Center - Footings and Foundation Bid Package 1
Infrastructure, Alteration
Post-Bid
Wautoma, WI 54982

Control Building Concrete
Alteration
Results
Fennimore, WI

Install Storm Sewer Piping
Infrastructure, Renovation
Construction
$178,689 CJ est. value
Fort McCoy, WI 54656

Concrete Pad for Recycling Facility
Alteration
Post-Bid
Pardeeville, WI 53954

2022 Concrete Repair Services
Alteration
Results
Janesville, WI

Engineering Hall Roof Replacement - General Bid
Renovation
Construction
$1,245,332 CJ est. value
Madison, WI 53706

Concrete Work
Alteration
Post-Bid
WI

Last Updated 05/10/2023 09:03 AM
Project Title

Re-gravel Main Access Road

Physical Address View project details and contacts
City, State (County) Phillips, WI 54555   (Price County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $116,250 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

All potential bidders must become certified by DOA prior to submitting bids on state construction projects with budgets over $50,000. All bids received from contractors who are not certified will be rejected. These changes take effect January 1, 2014. In general the work consists of: drainage swale construction, preparing the existing roadway foundation, and laying a new layer of gravel on the existing roadway using stockpiled gravel available on the property. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements.All potential bidders must become certified by DOA prior to submitting bids on state construction projects with budgets over $50,000. All bids received from contractors who are not certified will be rejected. These changes take effect January 1, 2014. Hand delivery to the drop box labeled SEALED BIDS ONLY in front of the State of Wisconsin 31 Administration Building located at 101 East Wilson Street, Madison, Wisconsin 53703.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents