Similar Projects
Wastewater System Improvements - Contract 2
Infrastructure
Bidding
$700,000 CJ est. value
Campbell, MO 63933

Drainage Improvements
Infrastructure
Bidding
$580,000 CJ est. value
Senath, MO 63876

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

Kennett 2021 Street
Infrastructure, Alteration
Post-Bid
Kennett, MO

Bridge Washing on I-70 and Route
Infrastructure
Results
$250,000 to $500,000 est. value

Resurface
Infrastructure
Results
$2,500,000 to $5,000,000 est. value
MO

RFP D/B - Frisco Park Improvements
Infrastructure
Bidding
$1,500,000 CJ est. value
Malden, MO 63863

MODOT Statewide Annual Plant (Cold) Mix Oil Material - Premix
Infrastructure
Post-Bid

Job Order Contract for Concrete Pavement Repair
Infrastructure
Results
$250,000 to $500,000 est. value

Job Order Contract for Asphalt Pavement Repair
Infrastructure
Post-Bid
$100,000 to $250,000 est. value

Asphalt Pavement Repairs at Various Locations on I-55, I-57, and I-155 in the SE District
Infrastructure
Results
$100,000 to $250,000 est. value

2022 Concrete Street Intersection Replacement
Infrastructure
Post-Bid
Kennett, MO

Intersection Improvement at Various Locations in the SE District
Infrastructure
Results
$1,000,000 to $2,500,000 est. value

Job Order Contract for Concrete Pavement Repair
Infrastructure
Post-Bid
$100,000 to $250,000 est. value

2022 Asphalt Street Overlays and Paving
Infrastructure
Post-Bid
Kennett, MO

Last Updated 11/16/2022 01:37 AM
Project Title

Pavement Improvements

Physical Address View project details and contacts
City, State (County) Kennett, MO 63857   (Dunklin County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $1,544,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

(1): Job J9S3337 Route M DUNKLIN County. Pavement improvements from Rte. 25 to Rte. 153, the total length of improvement being 2.499 miles. (2): Job J9S3339 Route P DUNKLIN County. Pavement improvements Rte. C in Senath to Rte. Y, the total length of improvement being 4.299 miles. (3): Job J9S3465 Route 108 DUNKLIN County. Pavement improvements from Arkansas State line to Rte. 412, the total length of improvement being 5.224 miles. FEDERAL PROJECT NUMBER(S): FAS S703(29), FAF S703(26), FAF S703(27) Range: 1M to 2.5M Each Bid Shall Be Accompanied by a Certified Check or Cashier's Check, Drawn on Any Bank or Trust Company and Payable to "Director of Revenue, Credit State Road Fund", or Bidders May Submit a Bid Bond for Each Project Bid or an Annual Bid Bond That Would Cover All Projects Bid for a Twelve Month Beginning July 1 and Ending June 30 of Each Missouri State Fiscal Year. Annual Bid Bond Forms Must Be Submitted by June 15 of Each Year. Bid bonds must be Submitted on a form furnished by the commission, executed by the bidder and corporate surety, and naming the "State of missouri, acting by and Through the missouri highways and transportation commission", as obligee) for an amount (or penal sum) equal to 5% or more of the bid, Which check or bond shall be deposited with the commission as a guaranty and forfeited in the event the bidder is found to be the successful bidder and fails to comply with the terms of the request for bid. The Missouri Highways and Transportation Commission Hereby Notifies All Bidders That It Will Affirmatively Insure That in Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, Religion, Creed, Sex, Age, Ancestry, or National Origin in Consideration for an Award. The Right Is Reserved by the Missouri Highways and Transportation Commission to Reject Any or All Bids. Any Contractor Who Desires to Bid on the Project(S) Involved in the Bid Opening Must Have a Contractor Questionnaire on File in the Office of the Missouri Highways and Transportation Commission at Least Seven Full Days (168 Hours) Prior to the Time of Bid Opening. A New Contractor Questionnaire Must Be Filed Annually Except That the Commission May Request a New Questionnaire at Any Time. MODOT - H05 - Pavement Improvements *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Notice to Proceed: December 5, 2022 Completion Date: October 1, 2023 Liquidated damages : the amount of $500 per calendar day for each calendar day

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents