Similar Projects
Holt Fire Station
New Construction
Conception
$813,000 est. value
Holt, FL

Longwood Fire Station 15/Public Safety Facility
New Construction
Conception
Longwood, FL

Tallahassee Police Headquarters
New Construction
Design
Tallahassee, FL

Fire Station 11
New Construction
Design
Orlando, FL

Fire Station 39 - Construction Manager at Risk Services
Renovation
Bidding
Largo, FL 33779

Orange County Fire Station - 54 Metal Storage Building Replacement
Renovation
Bidding
$192,000 est. value
Orlando, FL 32821

Cocoa Beach Police Headquarters
New Construction - 28,900 SF
Post-Bid
Less than $8,500,000 est. value
Cocoa Beach, FL

Town of Windermere Town Facilities
New Construction - 9,882 SF
Post-Bid
$5,200,000 est. value
Windermere, FL

Consultant Services for a New Police Headquarters
New Construction - 225,000 SF
Results
Fort Lauderdale, FL 33301

Sheriff`s District 2 Administration and Operations Center
New Construction - 51,000 SF
Results
Less than $21,000,000 est. value
Bunnell, Palm Coast, FL 32137

Replace Fire Crash Rescue Station, 125th Fighter Wing, Jacksonville, FL
New Construction - 17,400 SF
Construction
$5,000,000 to $10,000,000 est. value
Jacksonville, FL 32218

Construction of Bonaventure Fire Rescue Station No. 21
New Construction - 12,578 SF
Construction
Less than $5,250,000 est. value
Weston, FL 33326

Fire Station 17 and Community Resilience Center
New Construction
Conception
Tallahassee, FL 32310

Orlando Fire Station 6
New Construction
Design
Orlando, FL

Fire Station Number 80 Replacement
Renovation
Bidding
$5,510,000 est. value
Orlando, FL 32826

Last Updated 12/13/2021 10:13 AM
Project Title

Flagler County Sheriff's Office District 3

Physical Address View project details and contacts
City, State (County) Bunnell, FL   (Flagler County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method
Project Status Construction Commenced September 2021, Construction Completion Expected October 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Consist of the development of an 8 acre site and the construction of a 51,615 SF Sheriff’s Administration Building. Sitework will include the installation of aggregate piers, all underground utilities and asphalt parking/drive lanes. The main building will be constructed with tilt-up concrete panels with structural steel columns, beams and joists.

Details

1 Fire/Police Station, 2 Stories Above Grade, 51,615 SF New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats, Interior Planters and Artificial Plants, Interior Landscaping Accessories.
Division 14 - Conveying Equipment, Elevators, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents