Similar Projects
Main Library Remodel - 16-08 - City of Palm Springs
Demolition, Build-out, Infrastructure
Conception
$9,738,000 CJ est. value
Palm Springs, CA 92262

Back Up Generators at City Facilities - City of Palm Springs
Renovation
Conception
$950,000 CJ est. value
Palm Springs, CA 92262

UC Riverside Education Building II (SOM ED II)
New Construction
Design
$84,000,000 est. value
Riverside, CA 92521

Deferred Maintenance - Central Plant Towers
Renovation
Bidding
$1,350,000 CJ est. value
Palm Desert, CA 92260

Sliding Door Replacements at Moreno Valley College
Renovation
Bidding
$262,850 CJ est. value
Moreno Valley, CA 92551

University of California Riverside School of Business Building - Package 3
New Construction, Infrastructure - 66,600 SF
Sub-Bidding
$71,000,000 CJ est. value
Riverside, CA 92521

University of California Riverside School of Business Building - Package 4
New Construction, Infrastructure - 66,600 SF
Sub-Bidding
$71,000,000 CJ est. value
Riverside, CA 92521

Indio Campus Expansion
Renovation
Post-Bid
$10,000,000 est. value
Palm Desert, CA 92260

Lakeland Village Library Project and Calimesa Library Facility Design-Build Projects
New Construction
Post-Bid
$8,300,000 est. value
Riverside, CA

Riverside City College Life Science and Physical Science Reconstruction
Renovation - 57,280 SF
Results
$28,500,000 est. value
Riverside, CA 0251

LS & PS Reconstruction Project at Riverside City College
Addition, Demolition, New Construction, Renovation, Infrastructure - 57,280 SF
Results
$27,850,000 CJ est. value
Riverside, CA 92506

Heritage Room Expansion - 77330 - City of Corona
Addition, Demolition, Renovation, Infrastructure
Conception
$300,040 CJ est. value
Corona, CA 92882

12KV Loop Transformer and Switch Upgrades at Riverside City College
Renovation
Bidding
$278,000 CJ est. value
Riverside, CA 92501

RFQ D/B - School of Business Building
New Construction, Infrastructure - 36,000 SF
Post-Bid
$71,000,000 CJ est. value
Riverside, CA 92521

Rancho Mirage Library and Observatory Chihuly Glass Enclosure
Renovation
Results
$294,000 CJ est. value
Rancho Mirage, CA 92270

Last Updated 11/18/2022 02:12 PM
Project Title

Library and Center for Student Success Exterior Improvements at Norco College

Physical Address View project details and contacts
City, State (County) Norco, CA 92860   (Riverside County)
Category(s) Education, Government/Public
Sub-Category(s) College/University, Library - Public
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $191,800 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Caulking of exterior wall joints and window seal replacements of Wilfred J. Airey Library (Library) and Brenda and William Davis Center for Student Success (Center for Student Success/CSS) Buildings and the connecting bridge. Base bid will be the Library Building and Add/Alt. No. 1 will be the CSS Building. The Contract Timeline: Twenty two (22) calendar days Contractor License Classification: C17 Request For Information (RFI) due: November 1, 2022; 3:00PM Allowance: $5,000 CONTRACTOR should consult the General Conditions, Supplementary Conditions, and General Requirements regarding Milestones and Liquidated Damages. The lowest bid shall be the lowest bid price on the base contract without consideration of the prices on the additive or deductive items. Each bidder shall be a licensed contractor pursuant to the California Business and Professions Code, and be licensed to perform the work called for in the Contract Documents. The successful bidder must possess a valid and active Class C17 License at the time of bid and throughout the duration of this Contract. The Contractor's California State License number shall be clearly stated on the bidder's proposal. Subcontractors shall be licensed pursuant to California law for the trades necessary to perform the Work called for in the Contract Documents. Each bid must strictly conform with and be responsive to the Contract Documents as defined in the General Conditions. Each bidder shall submit with its bid -- on the form furnished with the Contract Documents -- a list of the designated subcontractors on this Project as required by the Subletting and Subcontracting Fair Practices Act, California Public Contract Code section 4100 et seq. In accordance with California Public Contract Code section 22300, the District will permit the substitution of securities for any moneys withheld by the District to ensure performance under the Contract. Each bidder's bid must be accompanied by one of the following forms of bidder's security: (1) cash; (2) a cashier's check made payable to the District; (3) a certified check made payable to the District; or (4) a bidder's bond executed by a California admitted surety as defined in Code of Civil Procedure section 995.120, made payable to the District in the form set forth in the Contract Documents. Such bidder's security must be in an amount not less than ten percent (10%) of the maximum amount of bid as a guarantee that the bidder will enter into the proposed Contract, if the same is awarded to such bidder, and will provide the required Performance and Payment Bonds, insurance certificates and any other required documents. In the event of failure to enter into said Contract or provide the necessary documents, said security will be forfeited. The Contractor and all subcontractors shall furnish certified payroll records as required pursuant Labor Code section 1776 directly to the Labor Commissioner in accordance with Labor Code section 1771.4 on at least on a monthly basis (or more frequently if required by the District or the Labor Commissioner) and in a format prescribed by the Labor Commissioner. Monitoring and enforcement of the prevailing wage laws and related requirements will be performed by the Labor Commissioner/ Department of Labor Standards Enforcement (DLSE). No bidder may withdraw any bid for a period of ninety (90) calendar days after the date set for the opening of bids. Separate payment and performance bonds, each in an amount equal to 100% of the total Contract amount, are required, and shall be provided to the District prior to execution of the Contract and shall be in the form set forth in the Contract Documents. All bonds (Bid, Performance, and Payment) must be issued by a California admitted surety as defined in California Code of Civil Procedure section 995.120. Where applicable, bidders must meet the requirements set forth in Public Contract Code section 10115 et seq., Military and Veterans Code section 999 et seq. and California Code of Regulations, Title 2, Section 1896.60 et seq. regarding Disabled Veteran Business Enterprise ("DVBE") Programs. Forms are included in this Bid Package. Any request for substitutions pursuant to Public Contract Code section 3400 must be made at least 10 calendar days prior to the time of Bid on the Substitution Request Form set forth in the Contract Documents and included with the bid. No telephone or facsimile machine will be available to bidders on the District premises at any time. It is each bidder's sole responsibility to ensure its bid is timely delivered and received at the location designated as specified above. Any bid received at the designated location after the scheduled closing time for receipt of bids shall be returned to the bidder unopened. The District reserves the right to reject any or all bids or to waive any irregularities or informalities in any bids or in the bidding

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Roof and Deck Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Library Stack Systems, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Furniture, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Study Carrels, Index Card File Cabinets, Multiple Seating, Portable Audience Seating, Seat and Table Assemblies.
Division 13 - Special Construction.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment, Central HVAC Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents