Similar Projects
WWFT Storage Tank Cleaning and Painting Projects
Post-Bid
New Port Richey, FL 34652

Storage Tank Repairs at Southeast Booster Station
Post-Bid
Less than $500,000 est. value
Panama City, FL 32403

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

Ground Storage Water Tank Repair, Northeast Florida State Hospital
Results
Macclenny, FL

Glass Fused-to-Steel Tank Rehabilitation
Term Contract
Results
Less than $377,516 est. value
Middleburg, FL 32068

Water Tank Replacement - Contract I
Results
Less than $500,000 est. value
Cottondale, FL 32431

SCWRF Reclaimed Water Storage Tank Improvements
Results
Less than $1,700,000 est. value
Naples, FL 34113

Water Storage Tank Replacement
Results
Less than $1,400,000 est. value
Cooper City, FL 33329

Underground Tank Spill Bucket Replacement
Results
Tavares, FL 32778

Tank Cleaning Services, Wastewater Treatment Plants, Term Contract
Term Contract
Results
West Palm Beach, FL 33437

Reclaimed Water Ground Storage Tank Cleaning and Inspection
Term Contract
Results
Less than $45,000 est. value
Naples, FL 34112

PEP Tank Replacement
Results
Ormond Beach, FL 32175

35,000 Gallon Elevated Storage Tank Rehabilitation
Results
Lake Como, FL 32157

Last Updated 02/16/2021 11:11 AM
Project Title

Picayune Strand Restoration Project, US41 and CR92 Conveyance Features, Design-Build Contract

Physical Address View project details and contacts
City, State (County) FL   (Collier County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DESCRIPTION OF WORK: The principal intent of this project is to provide hydraulic connectivity through the addition of new culverts under or adjacent to existing US Route 41(US41) and existing County Road 92 (CR92/San Marco Dr.) in Collier County. At the end of the project all construction for maintenance of traffic must be removed and the original grades restored for all locations. Culverts under US41- Three (3) new single barrel 12 foot wide by 4 foot high concrete box culverts will be located under US41, approximately 1,000-feet southeast of the intersection of US41 and Tomato Road. The three (3) culvert locations will create new hydraulic openings for conveyance from the Tamiami Canal to the south side of US41. Culvert barrels will not require skews. The limits of construction including any approach construction are from Sta. 810+00 to 837+00. Maintenance of traffic may extend beyond these limits. Culverts shall be considered bridge-sized culverts and require load rating in accordance with Florida Department of Transportation (FDOT) requirements. Culverts parallel to US41- Three (3) existing 36” HDPE pipe culverts are located in the Tamiami Canal parallel to US 41. Culverts are on the north side of US 41 and approximately 400 feet southeast of the intersection of CR92 (San Marco Rd.) at US41. Existing culverts are located under a driveway, allowing ingress and egress to the adjacent residents at 20201 Tamiami Trail East, which is located within Collier-Seminole State Park. Existing culverts shall remain and an additional 36” culvert shall be added adjacent to the existing culverts. Appropriate safety features shall be provided where clear zone requirements cannot be met and may include but not be limited to new barriers and guardrail. Culvert shall be provided in accordance with FDOT Standard Specifications for Road and Bridge Construction Section 430 Pipe Culverts. Culvert under CR92 (San Marco Drive)- One (1) new double barrel 10 foot wide by 3 foot deep concrete box culvert will be located under County Road 92 (San Marco Drive), approximately 2,400-feet west of the intersection of CR92 at US41. The new culvert will create a hydraulic opening for conveyance between the north and south sides of CR92. Culvert barrels will not require skews. The limits of construction including any approach construction are from Sta. 558+00 to 578+00. Maintenance of traffic may extend beyond these limits. Culvert shall be considered a bridge-sized culvert and requires load rating in accordance with FDOT requirements. US 41 is an evacuation route. Vehicular, two-lane, two-way, and pedestrian access shall be maintained at all times during construction in the maintenance of traffic plan. CR92 is an evacuation route. Vehicular, one-lane, one-way, and pedestrian access shall be maintained at all times during construction in the maintenance of traffic plan.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents