Similar Projects
Bimbo Group Production Facility
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
S Zanesville, OH 43701

Bimbo Group Production Facility
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
S Zanesville, OH 43701

Construction of Structures and Facilities
Term Contract, Renovation, Infrastructure - 15,500 SF
Design
$10,000,000 CJ est. value
S Zanesville, OH 43701

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

SR 134 - Culvert Replacement
Infrastructure
Bidding
$641,000 CJ est. value
Lynchburg, OH 45142

Dillon Lake State Park Wastewater Improvements
Infrastructure
Post-Bid
$2,600,000 CJ est. value
Nashport, OH 43830

Dust Control for 2022
Infrastructure
Post-Bid
Hopewell, OH

Asphalt Paving Village of Frazeysburg
Infrastructure
Results
$114,784 est. value
OH

Hillcrest Drive Asphalt Paving
Infrastructure
Results
$34,990 est. value
South Zanesville, OH 43701

Mitchell Water Storage Tank No.3 - Pioneer Tank Decommissioning Project
New Construction, Infrastructure
Construction
$3,035,439 CJ est. value
S Zanesville, OH 43701

Roadway Minor Rehab - SR 60
Infrastructure
Bidding
$4,051,078 CJ est. value
S Zanesville, OH 43701

Asphalt Paving
Infrastructure
Post-Bid
$87,956 est. value
Norwich, OH

Chip Seal- D10-Chip Seal FY2022 North
Infrastructure
Results

O.R.C. 307.87 - Road Resurfacing
Infrastructure
Bidding
$2,060,645 CJ est. value
S Zanesville, OH 43701

Township Road Resurfacing Bid
Infrastructure
Post-Bid
$200,000 est. value
Zanesville, OH 43701

Last Updated 03/16/2023 11:33 AM
Project Title

Westland Township 2023 Chip and Seal Project

Physical Address View project details and contacts
City, State (County) New Concord, OH 43762   (Muskingum County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status All Bids Received, Results Expected, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Westland Township 2023 Chip and Seal Project. Quilt Road .77 mi Amspoker Lane .2 mi Bliss Road .85 mi Moores Lane. .4 mi Hendershot Road .4 mi Red Lane .24 mi 2.86 miles total 18 foot average width MC-3000 road oil [or approved equivalent] applied at 0.35 gallon per square yard= approximately 10,000 gallons Project to include: Sweeping road prior to chip-n-seal Applying the road oil Full width chip spread with ODOT approved #8's limestone Roll stone in Flaggers and all traffic control Rollers shall conform with 422.03 of the 2019 ODOT CMS manual. Use type II pneumatic tire rollers conforming to 401.13. Project completion prior to October 31 2023. All figures are estimates and will be verified by the contractor prior to bidding. The board of Trustees reserves the right to waive any technicalities in the bidding, to reject any or all bids, and to enter into a contract with the bidder who, in their consideration, offers the best proposal.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents