Similar Projects
Jersey Mike's Subs
Build-Out
Conception
Austin, TX

Hoots Wings
Build-Out
Conception
Austin, TX 78744

River Street Residences
New Construction - 408,315 SF
Design
$10,000,000 CJ est. value
Austin, TX 78701

Greater Goods Coffee Co.
Build-Out - 600 SF
Design
Austin, TX 78745

Reagan's Crossing - Shell Buildings 1 & 2
New Construction - 22,350 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Leander, TX 78681

Target #T2288 - Beverage Bar Removal
Renovation, Demolition
Post-Bid
Austin, TX 78748

Municipal Golf Course Clubhouse Restaurant
Term Contract
Results
Lago Vista, TX 78645

Grab and Go Food and Beverage Cabinets
Alteration
Results
$112,750 est. value
Austin, TX 78751

54th Street Restaurant & Drafthouse
New Construction - 7,500 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Austin, TX 78748

Prep Austin - Commercial Food Preparation Facility
Renovation - 57,124 SF
Construction
Austin, TX 78752

East Village
New Construction
Pending Verification
$1,000,000,000 est. value
Austin, TX 78754

Velocity
New Construction - 3,795,000 SF
Pending Verification
$10,000,000 CJ est. value
Austin, TX 78617

Roll-Em-Up Taquitos
New Construction - 1,700 SF
Conception
$500,000 to $1,000,000 CJ est. value
Austin, TX

La Traviata
Build-Out - 2,933 SF
Design
Austin, TX 78735

Popeyes
Renovation - 2,024 SF
Post-Bid
Austin, TX 78702

Reported 07/06/2022 12:00 AM
Project Title

Another Broken Egg - The Linc / Austin

Physical Address View project details and contacts
City, State (County) Austin, TX 78752   (Travis County)
Category(s) Commercial
Sub-Category(s) Food/Beverage Service
Contracting Method Bids by Invitation.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $1,500,000 to $2,000,000
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: restaurant fit out As of June 14, 2022, this project is in design and permits will be submitted soon. The architect has been identified. The general contractor will be selected via bid, but bidding details are unavailable. Construction is anticipated to begin August 2022.

Details

Food/Beverage Service, 1 Story Above Grade, 3,678 SF Build-Out.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Thermal Insulation.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Walk-In Freezers, Foodservice Shelving, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Bar Equipment, Service Line Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment, Commercial Dishwashers.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents