Similar Projects
Last Updated | 08/10/2020 10:04 AM |
Project Title | SFY 2020 Water Main Replacement Project |
Physical Address | View project details and contacts |
City, State (County) | Ship Bottom, NJ 08008 (Ocean County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The total project includes the following: Removal and replacement of approximately 9,755 LF of existing water main with 8 inch Class 52 Ductile Iron Pipe with Push On type joints and approximately 1,090 LF of existing water main with 12-inch Class 52 Ductile Iron Pipe with Push On Type joints; removal, replacement and installation of approximately 1,730 LF of water services; replacement and installation of 18 hydrants; installation of approximately 62 gate valves; approximately 9,925 SY of Initial State/County Pavement restoration, approximately 14,160 SY of Final County/State Pavement restoration, and all required testing, disinfection, restriping, traffic control and landscaping. AND SFY 2020 Sewer Main Replacement Project New Jersey Infrastructure Bank, Project: S340311-05 Removal and replacement of approximately 6580 LF of existing sanitary sewer pipe with 8-inch PVC SDR 26 sanitary sewer pipe, removal and replacement of approximately 1327 LF of existing sanitary sewer with 10-inch PVC SDR 26 sanitary sewer pipe, removal and replacement of approximately 545 LF of existing sanitary sewer with 12-inch PVC SDR 26 sanitary sewer pipe, removal and replacement of approximately 805 LF of existing sanitary sewer with 15-inch PVC SDR 26 sanitary sewer pipe, removal and replacement of approximately 2187 linear feet of sanitary sewer lateral wyes and connect to existing lateral; removal and replacement of approximately 36 sanitary sewer manholes; removal and replacement of approximately 11,070 SY of initial State/County pavement restoration; removal and replacement of approximately 14,743 SY of Final State/County pavement restoration, and all required fittings, dewatering, restriping, traffic control and disturbed landscaping areas. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |