Similar Projects
Bank Stabilization Sewer Lift Station Site & Spring
Term Contract
Design
$100,000 to $250,000 est. value
Waynesboro, MS 39367

Group 3 EWP projects
Infrastructure
Bidding
Natchez, MS 39120

Lauderdale County Detention Facility: Drainage Repairs
Infrastructure
Bidding
Meridian, MS 39301

Erosion Repairs at CR 8541
Post-Bid
MS 38829

Drainage Improvements at Tennis Courts/Aquatic Center
Post-Bid
Booneville, MS 38829

Slide Repair
Results
MS

Bank Stabilization on US 84 at the Fair River (Bridge Nos. 74.9A and 74.9B)
Results
MS

Rehabilitate Airfield Drainage, Phase 2A Gulfport-Biloxi International Airport
Infrastructure
Bidding
$450,000 to $550,000 est. value
Gulfport, MS 39503

Emergency Watershed Protection
Post-Bid
MS

East Pinebrook Drive Drainage Improvement
Results
Brandon, MS

Jones College Campus Waterproofing and Drainage (Neill Student Center)
Infrastructure
Bidding
Ellisville, MS 39437

West Lincoln Attendance Center Football Field Grading and Drainage Improvements
Post-Bid
Brookhaven, MS 39601

Loyd Star Attendance Center Drainage and Grading Improvements
Results
$125,160 est. value
Wesson, MS 39191

Renourishment and Repairs of Hancock County Beach and Walking Path Repairs
Infrastructure
Bidding
MS

Emergency Watershed Protection Program - 2020
Post-Bid
Hernando, MS

Last Updated 12/16/2021 03:23 PM
Project Title

Fairways Place and Plantation Drive Drainage Improvements

Physical Address View project details and contacts
City, State (County) Vicksburg, MS 39183   (Warren County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $148,700
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of removing and replacing existing storm drainage pipes, regrading channel, placement of riprap and restoring the surrounding area after the new drainage improvements have been made. The construction will consist of clearing and grubbing, demolition, pavement removal and replacement, pipe removal, installation of storm drainage pipe and sodding.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents