Similar Projects
Last Updated | 03/31/2023 05:32 AM |
Project Title | Secondary Clarifier No. 2 Rehabilitation Project |
Physical Address | View project details and contacts |
City, State (County) | South Lake Tahoe, CA 96150 (El Dorado County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Sewage Treatment Plant, Site Development |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $2,064,900 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work to be performed consists of but is not limited to: rehabilitation of Secondary Clarifier No. 2 at the STPUD Wastewater Treatment Plant including mechanical, structural, electrical, and instrumentation improvements. This includes demolition of the existing sludge collector mechanism and replacement with a new sludge collector mechanism and appurtenances; seismic retrofits and rehabilitation of the existing concrete tanks; replacement of existing secondary clarifier handrail and V-notch weirs; installation of new density current baffles; demolition and replacement of existing RAS piping; new clarifier drive in existing MCC; integration of new sludge collector mechanism controls to the PLC; and site civil improvements including excavation, grading, and paving as required to accommodate new improvements. Major materials have already been procured by the District such as the sludge collector mechanism, baffles, covers, and weirs. This project is being funded, in part, by the California Clean Water State Revolving Fund (CWSRF) Program. The Contractor will be required to comply with State and federal contract rules and regulations including requirements for Disadvantaged Business Enterprise (DBE) and American Iron and Steel (AIS) as detailed in Sections 00_74_00 and 00_75_00 of the Specifications. The prime contractor is required to provide documentation that the local U.S. Small Business Administration (SBA) and/or the Minority Business Development Agency (MBDA) of the U.S. Department of Commerce were notified of the contracting opportunity at least thirty (30) calendar days prior to the bid opening date. A bid will be considered non-responsive unless it includes the forms required in Section 00_75_00 to be completed and submitted with the Bid. Special Notices Response Format Electronic Project Type Bid Type of Award Lump Sum License Requirements Class A Contractor License Liquidated Damages Yes, Refer to Bid Documents Estimated Bid Value $1,839,750.00 Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 03/21/2023 4:00 PM (PST) |
||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |