Similar Projects
Postvale Road, Grier Road Rehabilitation Phase 2 - ST095 - Town of Marana
Infrastructure
Conception
$260,000 est. value
Marana, AZ

Tangerine Road Widening, Phase 2A - ST098 - Town of Marana
Alteration
Conception
$27,000,000 est. value
Marana, AZ 85658

AutoZone #3618 / Tucson (Ajo)
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Tucson, AZ 85757

AutoZone #3618 / Tucson (Ajo)
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Tucson, AZ 85757

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

Tangerine Road Corridor Project Interstate 10 to Dove Mountain Boulevard/Twin Peaks Road - Phase 2 - Town of Marana
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Marana, AZ 85658

High Water Crossing at Vamori Wash
Results
$10,000,000 to $20,000,000 est. value
Tucson, AZ 85746

Pavement Preservation 2022
Infrastructure
Results
Marana, AZ 85653

Lohse Family YMCA Phase 2 - TI Package
Infrastructure, Renovation
Construction
$2,500,000 CJ est. value
Tucson, AZ 85701

Lohse Family YMCA Phase 2 - TI Package
Infrastructure, Renovation
Construction
$2,500,000 CJ est. value
Tucson, AZ 85701

22nd Street Manufacturing and Warehouse Building
New Construction, Infrastructure - 16,100 SF
Pending Verification
$2,000,000 CJ est. value
Tucson, AZ 85713

South Kolb Road Self-Storage
New Construction, Infrastructure - 14,511 SF
Pending Verification
$2,000,000 CJ est. value
Tucson, AZ 85756

First Avenue - River To Grant - SR11 - City Of Tucson
Infrastructure
Conception
$71,988,200 CJ est. value
Tucson, AZ 85719

Valencia - Kolb To Houghton - SR14 - City Of Tucson
Infrastructure
Design
$22,388,700 CJ est. value
Tucson, AZ 85746

Last Updated 03/15/2023 05:07 PM
Project Title

Pascua Yaqui Tribe Ignacio M. Baumea Reconstruction Project

Physical Address View project details and contacts
City, State (County) Tucson, AZ 85757   (Pima County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $4,500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The full reconstruction of a two-lane undivided roadway section to add bike lanes and sidewalk along Ignacio M. Baumea between Calle Torim and Los Reales Road, totaling 0.49 mile. Bid Work includes earthwork, the extension of a reinforced concrete box culvert, new pipe culverts, and associated inlet and outlet mitered ends, headwalls as shown, channel and roadside ditch excavation and erosion protection, furnishing and placing aggregate base and asphaltic concrete, constructing concrete curb, sidewalk, pavement markings, lighting, landscaping and irrigation, installation of artwork, and related incidental work., located on the New Pascua Reservation in Tucson, Arizona. Estimate for construction is approximately $3.5 - $4.5 million. RFI's will be accepted through 5:00 PM, Wednesday, March 1, 2023. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Native American and local firms will receive preference. The Owner reserves the right to select the most responsive and responsible bidder Each bid shall be made out on the bid form marked "04 Exhibit (A) - Bid Schedule Form", which shall be accompanied by a certified or cashier's check or bid bond for 5 percent (5%) of the total amount of the bid. Such check or bid bond will be given as a guarantee that the bidder will enter into the contract to perform the work if awarded to them and shall be declared forfeited as liquidated damages if the successful Bidder refuses to enter into the said Contract after being requested to do so by the Owner. Such check of bid bond will be returned to the respective unsuccessful Bidders upon the Award of the Contract to the successful Bidder and will be returned to the successful Bidder upon the execution and delivery of satisfactory surety company bonds and construction contract. Award of this Contract is subject to a determination by the Tribe that the contractor is eligible to contract for federally funded activities. The Contract time allotted for this project is 240 working days.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents