Similar Projects
Road Projects
Infrastructure
Bidding
$123,000 est. value
AR

Paving and Patching Streets
Infrastructure
Bidding
$153,000 est. value
Clinton, AR

Construction of Asphalt Overlay
Infrastructure
Post-Bid
Vilonia, AR

2022 Asphalt
Term Contract, Infrastructure
Post-Bid
AR

Stone Dam Creek Trail
Infrastructure
Results
Conway, AR

Statewide CLRS Improvements
Infrastructure
Results

High Performance Cold Mix
Infrastructure
Post-Bid

Beryl Road Improvements
Infrastructure
Results
AR

Asphalt Overlay of All Paved Surfaces at Carl Stuart Middle School
Infrastructure
Post-Bid
$290,000 est. value
Conway, AR 72034

Mayflower Overlay
Infrastructure
Results
Mayflower, AR

Asphalt Paving of the Back Drive at Carolyn Lewis Elementary School
Infrastructure
Post-Bid
$200,000 est. value
Conway, AR 72034

Hwy. 64 - South (Overlay)
Infrastructure
Results
AR

Vilonia Overlay (S)
Infrastructure
Results
Vilonia, AR

Clinton City Limits - Hwy. 65 (Overlay) (S)
Infrastructure
Results
AR

Greenbrier and Guy Overlay (S)
Infrastructure
Results
AR

Last Updated 07/11/2022 02:55 AM
Project Title

Hwy. 124 - S. Of Greenbrier (Sel. Secs.) (S)

Physical Address View project details and contacts
City, State (County) Clinton, AR 72031 (Faulkner, Van Buren Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Purpose of This Project Is to Level Select Areas With Achm Surface Course and Overlay With Ultrathin Bonded Wearing Course Approximately 14.591 Miles of Highway 65, South of Greenbrier, in Faulkner and Van Buren Counties. This Project Consists of Aggregate Base Course, Achm Surface Course, Cold Milling of Asphalt Pavement, Ultrathin Bonded Wearing Course, Maintenance of Traffic, Guardrail, Erosion Control, Rumble Strips, Pavement Marking, and Misc. Items. Routes: 65 Sections: 8 & 9 County: Faulkner & Van Buren Length: 14.591 miles in length.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Roadway Construction, Vehicle Barriers, Vehicle Guide Rails.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents