Similar Projects
Medical Unit Expansion and a Short-Term Housing Building
Renovation, Addition
Design
$3,000,000 est. value
Hurricane, Saint George, UT 84737

The Cove at Desert Color
New Construction, Infrastructure - 29,271 SF
Design
$6,800,000 CJ est. value
St George, UT 84790

Springdale Wastewater Lagoon Improvements Headworks Powered Screen
Infrastructure
Bidding
$700,000 CJ est. value
Springdale, UT 84767

Ash Creek Pipeline Project - Phase 1
Infrastructure
Bidding
$200,000 CJ est. value
St George, UT 84770

Springdale Wastewater Lagoon Improvements Sand Filtration
Renovation, Infrastructure
Sub-Bidding
$600,000 CJ est. value
Springdale, UT 84767

New State Bank of Southern Utah Steel Bid Package 1
New Construction, Infrastructure
Sub-Bidding
$500,000 CJ est. value
St George, UT 84790

Remodel of the Structure at 680 Zion Park Boulevard
Post-Bid
Springdale, UT 84767

Defense Health Agency - Medical Facility Operations and Maintenance
Post-Bid
$2,500 to $90,000,000 est. value

Bookcliffs Pond Maintenance and Excavating
Infrastructure
Results

SGES Bore Project - Riverside Drive
Infrastructure
Results
Saint George, UT 84790

Family Healthcare
New Construction - 30,352 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Saint George, UT 84790

Black Desert Resort
New Construction
Construction
Ivins, UT

Zion Regional Medical Center
New Construction - 551,778 SF
Pending Verification
$10,000,000 CJ est. value
Saint George, UT 84790

Sky Mountain Power Substation Grading and Utilities
Infrastructure
Post-Bid
Hurricane, UT

Ihc Southwest Orthopedics Clinic Expansion
Renovation
Construction
Saint George, UT 84790

Last Updated 08/04/2022 03:14 PM
Project Title

Zion Regional Medical Center

Physical Address View project details and contacts
City, State (County) St George, UT 84790   (Washington County)
Category(s) Heavy and Highway, Medical
Sub-Category(s) Medical Office/Outpatient, Site Development
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $50,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a hospital. On August 4, 2022, the project received zoning approval from the St. George City Council. A meeting will be held on August 9, 2022 for a zoning amendment. Information regarding the selection of a general contractor has not been released. A firm timeline for construction has not been confirmed. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

3 Stories Above Grade, 85,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Wall Coverings, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving.
Division 11 - Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Furnishings and Accessories, Seating.
Division 13 - Special Construction, Radiation Protection.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Healthcare Communications and Monitoring Systems.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents