Similar Projects
Wacker and Oakton Lift Station Upgrades
Renovation
Design
Savanna, IL

Canal Road Pump Stations No. 2 & No. 3 At Wood River Levee District
Renovation
Design
$1,000,000 to $5,000,000 est. value
Roxana, IL

Lift Station Rehabilitation PY21, (Pocket Road and Missouri Avenue)
Renovation
Bidding
$400,000 est. value
Alorton, IL 62207

Lift Station Rehabilitation PY21 (42nd Street and Market Avenue)
Renovation
Bidding
$3,000,000 est. value
Centreville, IL

High Lift Pump 7 Replacement
Renovation
Post-Bid
Northbrook, IL

STP Influent Pumping Station Rehabilitation
Post-Bid
Eldorado, IL

Lakeshore Drive Lift Station Replacement
Results
Decatur, IL 62521

Sugar Creek Pump Station Rehabilitation
Results
Less than $700,000 est. value
East Moline, IL

Kimundy Pump Station - Contract B
New Construction - 23,500 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Sandoval, IL 62882

York Road (LS-10) and Thomas Foster (LS-15) Lift Station Improvements
Post-Bid
Bensenville, IL 60106

Sugar Creek Pump Station Improvements
Results
Less than $10,000 est. value
Bloomington, IL

Main Street and Organ Street Pumping Station Rehabilitations
Renovation
Post-Bid
Eldorado, IL

Dawes Elementary Vacuum Pump Station
Renovation
Results
Chicago, IL 60652

Chasemoor Lift Station Rehabilitation
Renovation
Post-Bid
Burr Ridge, IL 60527

Automatic Transfer Switches North Chicago, Lake Bluff, And Cary Avenue Pump Stations
Renovation
Results
$750,000 est. value
Gurnee, IL

Last Updated 06/10/2022 02:37 AM
Project Title

Lawrence Avenue Lift Station Rehabilitation

Physical Address View project details and contacts
City, State (County) Joliet, IL 60435   (Will County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed construction consists of demolition of the existing wet well, valve vault, controls, generator and generator pad. New pre-cast polymer concrete wet well with two (2) submersible pumps, valve vault, meter vault, controls and natural gas fueled emergency power generator will be installed to replace the existing equipment. Work shall also include site piping with connections to existing gravity sewers and the forcemain. Proposed site improvements include grading and fill, asphalt repair, bollard installation and restoration of the site, as well as other miscellaneous items of work.

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents