Similar Projects
Reported | 12/01/2020 12:00 AM |
Project Title | Timnath Reservoir Shoreline Improvements |
Physical Address | View project details and contacts |
City, State (County) | Timnath, CO (Larimer County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Construction Management - CM at Risk. |
Project Status | Request for Proposals (RFPs) |
Bids Due | View project details and contacts |
Estimated Value | Less than $500,000 |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Phase 1 - Installation of a modular block wall. The wall will be approximately 562’ long x 4’ high above grade with a foundation extending approximately 3.5’ below grade. The retaining wall will have (2) sets of stairs extending down to concrete landings at the bottom of each stair run. A rip rap stone base will be installed along the reservoir side of the wall to armor against wave action as water levels fluctuate. There will also be grading and drainage infrastructure installation required. It is important to note reservoir water levels are low enough to allow construction during the next 2-3 months but can and do fluctuate based on Cache La Poudre Reservoir Company needs. Phase 2 – Landscape and Trail Improvements Additional reservoir improvements will be added concurrently or after wall completion to include a new gravel parking lot, connecting sidewalks and trail, shade structures, prefabricated restrooms, play area, sand volley ball/beach area, landscaping and irrigation. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |